Numerical Simulation Method for Coupling Project Dispatch and Pollutant Transport Process in Tidal River Network

A numerical simulation and pollutant technology, which is applied in the fields of electrical digital data processing, special data processing applications, instruments, etc., can solve the actual needs of project management that cannot consider the impact of engineering scheduling plans and is difficult to guide the joint optimal scheduling of sluice gates and pump station groups. And other issues
CN106202618BActive Publication Date: 2019-03-19PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION
Publication Date
2019-03-19

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a project scheduling and tidal river network pollutant transport process coupled numerical value simulation method. The method comprises the following steps of: establishing a tidal river network one-dimensional hydrodynamic force-water quality model; establishing a project application model to realize accurate and quantitative description of a project type and an application manner; solving the tidal river network one-dimensional hydrodynamic force-water quality model and the project application model by adoption of a finite difference format and a four-cascade solution; and establishing a gate pump group multi-target optimal scheduling model through aiming at targets of flood control, flood drainage and water quality improvement and project constraint conditions. According to the method disclosed by the invention, the accurate and quantitative description of interaction of a hydrodynamic process, a pollutant transport process and project scheduling is realized; and on the basis of simulating the project scheduling, the established gate pump group multi-target optimal scheduling model is utilized to obtain a gate pump group combined optimal scheduling scheme, so that the practical application value of the project scheduling simulation can be remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of water conservancy project dispatching and numerical simulation, and in particular relates to a numerical simulation method for coupling engineering dispatching and pollutant transfer process of a tidal river network. Background technique

[0002] The Pearl River estuary area is a region with rapid economic and social development in China, and has a pivotal strategic position in my country's economic construction. With the rapid development of social economy, the problems of water environment pollution, water supply safety, flood control (tide) and drainage in the Pearl River estuary area are becoming more and more prominent. The main factors causing these problems are excessive / insufficient hydrodynamic force and tidal river water body wandering back and forth. . Using sluices, pumping stations and other water conservancy projects to regulate the hydraulic regulation of tidal river networks is a key meas...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More