Reconstruction and reinforcement method for signal tower in communication base station and reinforced signal tower
A technology of communication base stations and signal towers, which is applied in the field of signal tower transformation, can solve problems such as low resource utilization, and achieve the effects of reducing resource waste, increasing stability, and increasing cross-sectional area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0058] Example 1
[0059] see figure 1 Shown is an embodiment of a method for rebuilding and strengthening a signal tower in a communication base station described in the present application, and the method for transforming and strengthening includes:
[0060] Step 101, processing the steel pipe into the same length as the rod to be reinforced in the signal tower;
[0061] Step 102, cutting the steel pipe multiple times along the diameter direction, and the cut parts form the first part of the pipe fitting and the second part of the pipe fitting respectively;
[0062] Step 103: Weld fixing pieces on the first and second partial pipes formed by cutting respectively, and the fixed pieces are symmetrically positioned on the first and second partial pipes, and close all the pieces. When the first part of the pipe fitting and the second part of the pipe fitting are made, the symmetrical fixing pieces are overlapped;
[0063] Step 104 , perform the operations of cutting the steel...
Example Embodiment
[0086] Example 2
[0087] The present invention also provides a signal tower reinforced by the above-mentioned signal tower reinforcement and reconstruction method. The signal tower includes: a rod to be reinforced 10 , a first part of a pipe part 20 and a second part of the pipe part 30 . For the structure of the first part of the pipe part 20 and the second part of the pipe part 30, please refer to figure 2 .
[0088] Fixing pieces 40 are symmetrically distributed on the first part of the pipe part 20 and the second part of the pipe part 30 ,
[0089] The first part of the pipe 20 and the second part of the pipe 30 are bonded to the rod to be reinforced 10 by structural glue, and the first part of the pipe 20 and the second part of the pipe 30 are fixed by the fixing sheet 40;
[0090] The first part of the pipe part 20 and the second part of the pipe part 30 are made by cutting multiple times along the diameter direction of the steel pipe, and after each cutting, the fix...
Example Embodiment
[0108] Example 3
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap