Method for building waterproof layer construction by utilizing FS101 mortar waterproof agent
A FS101, building waterproofing technology, applied in the direction of buildings, building components, building structures, etc., can solve the problems of reducing mortar shrinkage, etc., to achieve the effects of reducing mortar shrinkage, improving mortar compactness, and improving compactness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] A method for constructing a building waterproof layer using FS101 mortar waterproofing agent, comprising the following steps:
[0029] Step 1, building base inspection, cleaning, detail treatment;
[0030] Step 2, combined layer processing;
[0031] Step 3, apply waterproof plain slurry and apply waterproof mortar;
[0032] Step 4, after-treatment of the waterproof layer;
[0033] FS101 mortar waterproofing agent and water are mixed according to the weight ratio of 1:200 to form FS101 mortar waterproofing agent dilution; the preparation process of the waterproof plain slurry is as follows: cement and FS101 mortar waterproofing agent dilution according to the weight ratio of 1:0.45~0.55 ratio mixing; the preparation process of the waterproof mortar is as follows: cement:sand:diluent is mixed according to the weight ratio of 1:1.5~2.5:0.45~0.55.
Embodiment 2
[0035] A method for constructing a building waterproof layer using FS101 mortar waterproofing agent, comprising the following steps:
[0036] Step 1, inspection, cleaning, and detailed treatment of the building base; the specific steps of step 1 are: before the construction of the waterproof layer, the base of the building should be flat, rough, firm, clean, free of peeling, sand, and loose; the base should be fully Wet, but there should be no water; level the concrete protruding from the surface of the base, and remove loose stones. When there are cracks, pockmarks, holes or gaps in the base that are not smooth, pre-treatment should be done according to the specific situation.
[0037] Step 2, detail processing of the building base;
[0038] Step 3: Apply waterproof plain slurry and apply waterproof mortar; the construction process on the concrete cushion is to first apply 2mm waterproof plain slurry, and then apply 20mm waterproof mortar. The construction process on the bri...
Embodiment 3
[0044] A method for constructing a building waterproof layer using FS101 mortar waterproofing agent, comprising the following steps:
[0045] Step 1, inspection, cleaning, and detailed treatment of the building base; the specific steps of step 1 are: before the construction of the waterproof layer, the base of the building should be flat, rough, firm, clean, free of peeling, sand, and loose; the base should be fully Wet, but there should be no water; level the concrete protruding from the surface of the base, and remove loose stones. When there are cracks, pockmarks, holes or gaps in the base that are not smooth, pre-treatment should be done according to the specific situation.
[0046] Step 2, combined layer processing;
[0047] Step 3: Apply waterproof plain slurry and press waterproof mortar; the construction process on the concrete cushion is first to do roughening work, mix 108 glue in the cement slurry, then apply 2mm waterproof plain slurry, and then apply 20mm waterpro...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com