A technology of water content and slope body, applied in excavation, soil protection, construction, etc., can solve the problems of high cost, long period, and difficult construction of slope drainage projects, and achieve low cost, reduce water content, and project implementation Easy and fast effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] like figure 1 and figure 2 As shown, a device that uses solar energy to reduce the water content of the slope body includes a heat-insulating steel pipe 8 that is inserted into the slope body drainage ditch 7 and has a water vapor overflow port 6 at the top. The lower section of 8 is evenly distributed with a plurality of preset holes 9, and the 8 sections of heat-insulating steel pipes with a plurality of preset holes 9 are wrapped with a geotextile layer 10. A water-stop rubber ring 12, a heating device 17 is installed in the heat transfer conical tube 13, and a moisture content monitoring probe 15 is installed outside the heat transfer conical tube 13;
[0020] The solar panel 3 , the master switch 2 , the control module 1 and the moisture content monitoring probe 15 are connected in series through the wire 5 to form a closed loop, and the heating device 17 is electrically connected to the control module 1 .
[0021] The solar panel 3 is installed on the heat insu...
Embodiment 2
[0030] like image 3 As shown, a method for reducing the water content of the slope by using the device, the master control switch 2 is turned on, the water content monitoring probe 15 works, and the monitoring signal is transmitted to the control module 1. If the water content of the rock and soil at the monitoring position is higher than the threshold value, control The module 1 is connected to the working branch of the heating device 17, the heating device 17 works and heats, the water evaporates, overflows through the water vapor overflow port 6 on the top of the heat insulating steel pipe 8, and the water vapor solidifies and gathers and drips in the drainage ditch 7, and is discharged outside the slope, thereby achieving For the purpose of reducing the moisture content of the rock and soil mass of the slope, continue to heat the rock and soil mass until the moisture content of the monitored rock and soil mass is lower than or equal to the threshold value, and the control ...