A slab ballast bed and construction method technology, applied to roads, tracks, ballast layers, etc., can solve the problems of weak quality control means, poor construction operation environment, high labor intensity, etc., and achieve high concrete transportation efficiency and good construction operation environment , fast maintenance effect

Active Publication Date: 2018-06-12
CHINA RAILWAY ENG MASCH RES & DESIGN INST CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention mainly solves the problems of environmental pollution, noise pollution, high labor intensity, poor construction operation environment, and weak quality control means caused by the overall construction of the subway track existing in the prior art, and proposes a subway slab track bed construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of subway slab track bed
  • Construction method of subway slab track bed
  • Construction method of subway slab track bed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] see figure 1 , The subway slab track bed construction method includes the following processes: construction preparation → floating slab base reverse paving construction → connection surface treatment construction → prefabricated floating slab and track forward laying → track fine adjustment and fixing and accessories installation.

[0033] see figure 2 , a schematic diagram of the base reverse paving construction and the floating slab and track forward paving work of the subway slab track bed construction method, which is characterized in that the base reverse paving construction equipment includes a transport mixer truck 3, a storage truck 5 and a paver 7 ; Floating slabs and track forward laying equipment include laying machines 8 and 11 flat cars.

[0034] Referring to Fig. 3, the reverse paving construction of the floating slab base of the subway slab track bed construction method is characterized in that it comprises the following steps:

[0035] a. If Figure ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method for a plate ballast bed of a metro. The method comprises the steps of a basement backward paving construction step, in which a truck mixer transports concrete from a front material feeding well segment to a material storage truck to and fro via a pump or a belt conveyer in a backward moving manner, the material storage truck moves backward to an area to be paved and discharges concrete, and a paver paves; and a plate pathway conveying and paving steps, in which a back pathway and floating plates are transported to a construction area by using a flatcar, a plate paver is used for sequentially discharging the floating plates from the flatcar and paving the same to a predetermined area; and then the pathway is discharged from the flatcar and paved on the floating plates. According to the method provided by the invention, building of a temporary pathway is not needed, the damage to tunnel segments caused by the temporary pathway when the temporary pathway is supported and fixed is reduced, and the construction speed is rapid; in a tunnel, both the truck mixer and the material storage truck can move on a plane as well as a hook face for conveying the concrete, so that the concrete transportation cost is low, and the adaptability is good; the backward paving construction can be operated with subsequent construction in parallel, so that the construction efficiency is high.

Description

technical field [0001] The invention relates to a construction method, which belongs to the field of railway construction, in particular to a construction method of a subway slab track bed. Background technique [0002] With the rapid development of modern high-speed railways, slab track ballastless tracks have been widely used in domestic high-speed railways and passenger dedicated lines in recent years. The slab track ballastless track not only has better line stability and rigidity uniformity, but also has high track smoothness and durability, which can reduce the amount of line maintenance. [0003] In the traditional integral track bed construction of subway tracks, basically all concrete structures are poured on site, which not only pollutes the environment and creates noise, but also increases the labor intensity of workers, the construction environment is poor, and the quality control methods are relatively weak. From the perspective of the construction quality of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E01B1/00
CPCE01B1/002
Inventor 罗璞黄超王伟沈超王洪刚
Owner CHINA RAILWAY ENG MASCH RES & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products