A Pre-grouting Reinforcement Process for Subway Tunnel Surrounding Rock Ground
A pre-grouting, subway technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems of large settlement, weakened surrounding rock support effect, low subway construction efficiency, etc., to expand the reinforcement range and achieve obvious reinforcement effect. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] In order to clearly illustrate the solutions in the present invention, preferred embodiments are given below and detailed descriptions are given in conjunction with the accompanying drawings.
[0031] A pre-grouting reinforcement process for surrounding rock ground of a subway tunnel, comprising the following steps:
[0032] (1) Determine the surrounding rock range of the subway tunnel that needs to be reinforced, which is the target rock mass area;
[0033] The length of the surrounding rock is less than or equal to 200m; the surrounding rock mass of the subway belongs to the scope of grade IV or above, that is, the basic quality index BQ of the rock mass is greater than or equal to 251, and is suitable for subway tunnels constructed by shield tunneling method and mining method.
[0034] (2) Construction of inclined hole-making section: construction of inclined drilling, so that the inclined drilling is close to the target rock mass area from far to near, and gradually...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com