Construction method for full-sleeve rotary drilling pouring pile with position of reinforcing cage being fixed
A technology of bored piles and construction methods, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of hanging piles, high engineering cost, and low pile bearing capacity, so as to improve construction efficiency and speed up construction. Effect of construction progress and pile quality control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as Figures 1 to 3 as shown, figure 1 It is a flowchart of a construction method for a full-sleeve rotary bored pile with a fixed steel cage position proposed by the present invention, figure 2 It is a structural schematic diagram of the drill bit drilling into the borehole in the construction method of a full-sleeve rotary bored pile construction method with a fixed steel cage position proposed by the present invention, image 3 It is a structural schematic diagram of the steel partition of the reinforcement cage in the construction method of the full-sleeve rotary bored pile with fixed reinforcement cage position proposed by the present invention.
[0024] refer to Figures 1 to 3 A construction method for a full-sleeved rotary bored pile with a fixed steel cage position proposed by the present invention comprises the following steps:
[0025] S1. Use a drilling rig to drill holes to the design elevation at the location to be constructed. The drilling rig inc...