Billet erected heating method
A heating method and billet technology, which is applied in the field of heating method and billet vertical heating method, can solve the problems of slow heating speed, long heating time, and high energy consumption, and achieve the effects of increasing heating speed, reducing floor space, and saving energy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] When the billet 11 is a seamless tube billet, hot-rolled thin plate slab, medium plate slab, round steel, square steel, figure 1 It is a schematic side view of a steel billet set in a groove. figure 2 It is a schematic front view of a steel billet set in a groove. The steel billet 11 is arranged in the upper and lower opposite grooves of the guide rail 10, and the thickness direction or diameter direction of the steel billet 11 is consistent with the width direction of the groove. During the process, the steel billet 11 is heated on both sides. When the steel billet 11 is loaded into the furnace, the heating furnace is in a high-temperature state. After heating, the steel billet 11 reaches the set temperature. After being released from the furnace, the steel billet 11 is directly rolled or forged under the "zero" heat preservation state. In the figure, 10a is the upper guide rail, 10b is the groove of the upper guide rail, 12a is the upper guide rail, and 12b is the...
Embodiment 2
[0019] When the billet 11 is a large slab, image 3 It is a schematic side view of a large slab arranged in a heating furnace. Figure 4 It is a schematic front view of a large slab arranged in a heating furnace. The guide rails 10 are arranged on both sides of the heating furnace, the surface of the large slab is consistent with the forward direction, and spacers 13 are arranged at the upper and lower positions between the large slabs, and the billet moves along the guide rails 10 provided on both sides of the heating furnace under the action of external force During the moving process, the steel billet 11 is heated on both sides. When the steel billet 11 is loaded, the heating furnace is in a high-temperature state. After the heated steel billet 11 reaches the set temperature, the steel billet 11 is released from the furnace. Steel rolling or forging, the groove of the guide rail 10 is provided with a roller 14, the roller 14 can be arranged on the bottom or side of the gr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 