Embodiment 1
[0039] A high-efficiency cement filling equipment for trenches on construction sites, such as Figure 1-8 As shown, it includes a bottom plate 1, a first rotating shaft 3, a tire 4, a supporting plate 5, a bracket 6, a first blanking plate 7, a cement box 8, a blanking pipe 9, a supporting seat 10, a second rotating shaft 11, and a first The baffle 12, the rubber plate 13, the first connecting block 14, the bearing seat 15, the rotating rod 16 and the first fixing plate 17, the bottom plate 1 always has two sides with empty slots 2, and the left and right sides of the empty slot 2 rotate The first rotating shaft 3 is connected to the first rotating shaft 3, the tire 4 is connected to the first rotating shaft 3, the upper middle of the bottom plate 1 is installed with a support plate 5 by welding, and the left middle of the support plate 5 is installed with a bracket 6 and a bracket 6 by welding. A first blanking plate 7 is installed on the left side by welding, a cement box 8 i...
Embodiment 2
[0041] A high-efficiency cement filling equipment for trenches on construction sites, such as Figure 1-8 As shown, it includes a bottom plate 1, a first rotating shaft 3, a tire 4, a supporting plate 5, a bracket 6, a first blanking plate 7, a cement box 8, a blanking pipe 9, a supporting seat 10, a second rotating shaft 11, and a first The baffle 12, the rubber plate 13, the first connecting block 14, the bearing seat 15, the rotating rod 16 and the first fixing plate 17, the bottom plate 1 always has two sides with empty slots 2 on the lower side of the bottom plate 1, and the left and right sides of the empty slot 2 rotate The first rotating shaft 3 is connected to the first rotating shaft 3, the tire 4 is connected to the first rotating shaft 3, the upper middle of the bottom plate 1 is installed with a support plate 5 by welding, and the left middle of the support plate 5 is installed with a bracket 6 and a bracket 6 by welding. A first blanking plate 7 is installed on th...
Embodiment 3
[0044] A high-efficiency cement filling equipment for trenches on construction sites, such as Figure 1-8 As shown, it includes a bottom plate 1, a first rotating shaft 3, a tire 4, a supporting plate 5, a bracket 6, a first blanking plate 7, a cement box 8, a blanking pipe 9, a supporting seat 10, a second rotating shaft 11, and a first The baffle 12, the rubber plate 13, the first connecting block 14, the bearing seat 15, the rotating rod 16 and the first fixing plate 17, the bottom plate 1 always has two sides with empty slots 2, and the left and right sides of the empty slot 2 rotate The first rotating shaft 3 is connected to the first rotating shaft 3, the tire 4 is connected to the first rotating shaft 3, the upper middle of the bottom plate 1 is installed with a support plate 5 by welding, and the left middle of the support plate 5 is installed with a bracket 6 and a bracket 6 by welding. A first blanking plate 7 is installed on the left side by welding, a cement box 8 i...