Construction method of high flatness and large area concrete floor in industrial workshop
A technology for industrial plants and construction methods, applied in the processing of building materials, construction, building components, etc., can solve problems such as inconvenience, and achieve the effect of ensuring cutting quality, simple structure, and convenient production.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] see now figure 1 , figure 1 It is a schematic plan view of a large-area concrete floor in an embodiment of the present invention.
[0041] The construction method of high-flatness and large-area concrete ground for industrial workshops of the present invention is characterized in that it comprises the following steps:
[0042] a. Select the appropriate construction machinery to ensure the correct use of construction machinery, including the following steps:
[0043] (1) Purchasing or leasing the machinery required for construction, including grinding machines and cutting machines, and doing a good job in the inspection, repair and maintenance of construction machinery to ensure that the construction machinery can be used normally;
[0044] (2) The technical parameters of the polishing machine must ensure that the grinding accuracy is within 3mm, and the lifting, troweling, and calendering of the concrete are operated by experienced and responsible workers, and trial g...