Rapid forming construction method for underground water collecting pit
A construction method and sump technology, which are applied to waterway systems, water supply devices, drainage structures, etc., can solve the problems of tight time requirements, high safety risks, and high construction costs, and achieve convenient production, reduce safety risks, and improve labor efficiency. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] The rapid prototyping construction method of underground sump of the present invention comprises the following steps:
[0021] see now figure 1 , figure 1 It is a structural schematic diagram of a forming mold box according to an embodiment of the present invention.
[0022] a. Make forming mold box 8: According to the size and depth of the underground sump, use ≥ 8mm thick steel plate, cut the steel plate to obtain a forming mold box bottom plate 3, two forming mold boxes long side wall 2 and two forming mold boxes short direction Side wall 1, the long side wall of the forming mold box, the short side wall of the forming mold box and the bottom plate of the forming mold box are welded together to form a barrel with the bottom plate of the forming mold box, the long side wall of the forming mold box and the forming mold box The box is strengthened by welding steel bar diagonal braces 5 between the side wall panels in the short direction, and two "U" shaped steel bar l...