Concrete pipe pile device and its construction method
A technology of concrete pipe piles and pipe piles, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of increased construction difficulty and increased friction, and achieve the goals of improving construction efficiency, reducing resistance, and preventing eccentricity Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] refer to figure 1 A concrete pipe pile device comprises a cylindrical pile body 1 and a pipe pile head 2 connected to the lower end of the pile body 1 and capable of rotating relative to the pile body 1 . Inside the pile body 1 there is a chamber 11 with a circular cross-section. The lower end of the chamber 11 communicates with the outside, and the upper end of the chamber 11 communicates with a rectifying groove 12 with the same circular cross-section. The diameter of the rectifying groove 12 is larger than that of the chamber. The diameter of 11 makes the two form a stepped surface at the joint, and a deviation-correction mechanism 4 is installed in the deviation-correction groove 12, and the deviation-correction mechanism 4 is axially limited by the gland 13 connected to the upper end surface of the pile body 1.
[0047] The concrete pipe pile device also includes a driving mechanism, which includes a driving rod 3 with a cylindrical cross section. The driving rod 3...
Embodiment 2
[0055] A construction method using the concrete pipe pile device in Embodiment 1 specifically comprises the following steps:
[0056] Step 1. Measure and place the pile position
[0057] The pile position should be set out according to the site control piles. When setting out the pile position, it should be based on the design requirements. First, determine the relative coordinates of the pile position, drive the center of the pile position into the ground 500mm with a bamboo stick, and use the quicklime line to adjust the pile diameter. Delineate, and at the same time, 500mm below the ground is used as the base level.
[0058] Step 2, pile driver in place
[0059] A diesel pile driver is used to hoist the concrete pipe pile device into the pile driver, and the pipe pile head 2 is positioned at the center of the pile position.
[0060] Step 3, Piling
[0061] After the concrete pipe pile device is positioned, the pile sinking begins. The pile hammer coincides with the cente...