High-speed railway tunnel construction reinforcement method and duct
A technology for tunnel construction and high-speed railways, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., and can solve problems such as poor stability and difficult construction of high-speed railway tunnels
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
[0033] Such as figure 1 As shown, the present invention provides a kind of high-speed railway tunnel construction reinforcement method, comprises the following steps:
[0034] S1: Circle the conduit hole on the tunnel face, and drill the hole with an air drill; after drilling to the designed hole depth, use a blowpipe to blow out the debris to avoid hole collapse; the conduit hole is formed with an air gun or a rock drilling rig Drilling holes, avoiding the swing of the drill pipe and ensuring the straightness of the hole position;
[0035] S2: Insert the catheter into the hole, reserve 20cm to 40cm of slurry stop section at the end of the catheter, 30cm in this embodiment, wrap the hemp silk...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


