Manufacture process of high-strength retaining ring for megawatt nuclear power units
A nuclear power unit and manufacturing process technology, which is applied in the field of ring forging, can solve the problems that the technical indicators of the retaining ring cannot meet the requirements, the manufacturing difficulty is large, and the manufacturing process of the high-strength retaining ring is immature.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0015] The present invention will be further described in detail below in conjunction with specific embodiments.
[0016] The manufacturing process of high-strength retaining rings for megawatt nuclear power units, the process steps are as follows: blanking → heating before forging → upsetting, relay punching, horse frame reaming → heating before forging → ring rolling → rough car flaw detection → solidification Melting heat treatment→cold deformation strengthening→stress relief heat treatment→finish turning;
[0017] (1) Cutting: The steel grade is 1Mn18Cr18N electroslag ingot as raw material, and its chemical composition requirements are as follows: C: ≤0.12%, Si: ≤0.80%, Mn: 17.50~20.00%, P: ≤0.050%, S: ≤0.015%, Cr: 17.50~20.00%, Al: ≤0.030%, N: ≥0.47%, B: ≤0.001%; before blanking, remove the hardened layer, slag, pits, grooves on both ends of the ingot, Defects such as inclination; the size of the billet obtained by blanking is φ414×φ422×585, and the weight is about 633...