Method and device for controlling passing of rail vehicles at level crossing under half-exclusive right-of-way
A level crossing and control method technology, which is applied in the field of control methods and devices for level crossings under the semi-exclusive right of way of rail vehicles, can solve problems such as impact, and achieve the effects of avoiding cumulative errors, promoting integration, and shortening the distance of target points
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] The selection of the tram traffic scheme at the level crossing is based on the efficiency value of the priority strategy, and the one with the highest efficiency value is the best. The efficiency value of the priority strategy is related to two factors: the delay time of the tram at the level crossing f(t 0 , t) The delay time d(t 0 , t), where t 0 is the moment when the tram arrives at the level crossing, t is the time when the road traffic signal control machine at the level crossing delays opening the tram line, the value range of t is affected by the time when the tram arrives at the level crossing and the current level crossing Due to the limitation of crossing phase cycle composition, the value of t has a range in consideration of safety factors. figure 1 It is a flow chart of the tram level crossing traffic control method of this embodiment. The method of this embodiment can be carried out in the crossing controller of the operating system of the tram. refer ...
Embodiment 2
[0127] The punctuality rate is an important factor to measure the service level of the tram operation. Another embodiment of the present invention proposes a tram line passage scheme aimed at improving the punctuality rate while minimizing the impact on social vehicles, while taking into account the Tram speed.
[0128] Arrange platform beacons at each platform of the main line of the tram and arrange level crossing beacons at each level crossing. The original operation goal of the tram is to arrive at each platform beacon on time according to the timetable. Now, the inter-station area is divided into multiple small areas through the level crossing beacon, and the level crossing beacon becomes the target point for operating the tram. , so as to shorten the running distance between the starting point and the target point and improve the operation accuracy.
[0129] The schematic diagram of multi-area level crossing division between stations is as follows: Figure 7 As shown, ...
Embodiment 3
[0165] The tram level crossing passing scheme designed in the present invention requires the tram to reach each level crossing beacon within a specified time, so as to realize the high punctuality rate of the tram and maximize the utilization rate of the level crossing. However, factors such as the failure of the road traffic signal control machine at level crossings may cause changes in the phase cycle composition of the road traffic signal control machine in the predetermined state, making the original strategy impossible to achieve. Another embodiment of the present invention proposes a scheme for improving the robustness of the tram level crossing passage scheme.
[0166] Figure 9 It is a flow chart of improving the robustness of tram operation in this embodiment.
[0167] Step 301: Read the current speed and current position of all trams in the inter-station area, and the positions of all trams in the inter-station area become virtual platforms.
[0168] When the sched...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com