Method and device for controlling passing of rail vehicles at level crossing under half-exclusive right-of-way

A level crossing and control method technology, which is applied in the field of control methods and devices for level crossings under the semi-exclusive right of way of rail vehicles, can solve problems such as impact, and achieve the effects of avoiding cumulative errors, promoting integration, and shortening the distance of target points

Active Publication Date: 2018-05-08
HUNAN CRRC TIMES SIGNAL & COMM CO LTD
View PDF10 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The idea of ​​this paper is to formulate a tram signal priority scheme for the offline coordination of tram multi-intersections. , "Phase Insertion" as a backup plan in order to maximize the operating efficiency of trams, but this concept also fails to maximize the balance between trams and social vehicles at level crossings, and once a train of trams appears Deviating from the coordinated traffic priority scheme during operation will have an impact on the subsequent tram coordinated traffic priority scheme

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for controlling passing of rail vehicles at level crossing under half-exclusive right-of-way
  • Method and device for controlling passing of rail vehicles at level crossing under half-exclusive right-of-way
  • Method and device for controlling passing of rail vehicles at level crossing under half-exclusive right-of-way

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0063] The selection of the tram traffic scheme at the level crossing is based on the efficiency value of the priority strategy, and the one with the highest efficiency value is the best. The efficiency value of the priority strategy is related to two factors: the delay time of the tram at the level crossing f(t 0 , t) The delay time d(t 0 , t), where t 0 is the moment when the tram arrives at the level crossing, t is the time when the road traffic signal control machine at the level crossing delays opening the tram line, the value range of t is affected by the time when the tram arrives at the level crossing and the current level crossing Due to the limitation of crossing phase cycle composition, the value of t has a range in consideration of safety factors. figure 1 It is a flow chart of the tram level crossing traffic control method of this embodiment. The method of this embodiment can be carried out in the crossing controller of the operating system of the tram. refer ...

Embodiment 2

[0127] The punctuality rate is an important factor to measure the service level of the tram operation. Another embodiment of the present invention proposes a tram line passage scheme aimed at improving the punctuality rate while minimizing the impact on social vehicles, while taking into account the Tram speed.

[0128] Arrange platform beacons at each platform of the main line of the tram and arrange level crossing beacons at each level crossing. The original operation goal of the tram is to arrive at each platform beacon on time according to the timetable. Now, the inter-station area is divided into multiple small areas through the level crossing beacon, and the level crossing beacon becomes the target point for operating the tram. , so as to shorten the running distance between the starting point and the target point and improve the operation accuracy.

[0129] The schematic diagram of multi-area level crossing division between stations is as follows: Figure 7 As shown, ...

Embodiment 3

[0165] The tram level crossing passing scheme designed in the present invention requires the tram to reach each level crossing beacon within a specified time, so as to realize the high punctuality rate of the tram and maximize the utilization rate of the level crossing. However, factors such as the failure of the road traffic signal control machine at level crossings may cause changes in the phase cycle composition of the road traffic signal control machine in the predetermined state, making the original strategy impossible to achieve. Another embodiment of the present invention proposes a scheme for improving the robustness of the tram level crossing passage scheme.

[0166] Figure 9 It is a flow chart of improving the robustness of tram operation in this embodiment.

[0167] Step 301: Read the current speed and current position of all trams in the inter-station area, and the positions of all trams in the inter-station area become virtual platforms.

[0168] When the sched...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for controlling the passing of rail vehicles at a level crossing under half-exclusive right-of-way. The method includes the following steps: reading the time t0 when arail vehicle arrives at the beacon of a level crossing and the phase cycle composition Tnow(t0) and the working state of a signal control machine at the level crossing at the time t0; determining thevalue range of the delay time t in opening the rail vehicle passing route according to the time t0, the phase cycle composition Tnow(t0) and the working state; calculating the delay time f(t0, t) of arail vehicle passing the level crossing and the delay time d(t0, t) increased by social vehicles at the level crossing; calculating the efficiency value e(t0, t) according to the delay time f(t0, t)of the rail vehicle passing the level crossing and the delay time d(t0, t) increased by social vehicles at the level crossing, determining that t=td, and maximizing the efficiency value e(t0, t); andopening the rail vehicle passing route after a delay of the time td, and adjusting the operation cycle of the level crossing according to the time td. The delay caused by tramcars to the social traffic can be minimized while the operation efficiency of tramcars is maximized, and the integration of tramcars and road vehicles can be promoted.

Description

technical field [0001] The present invention relates to a control method and device for a rail vehicle, and more specifically, to a method and device for controlling the passage of a rail vehicle at a level crossing under a semi-exclusive right of way. Background technique [0002] Under the semi-exclusive right of way, the level crossing is the only area where trams interact with social vehicles, which affects the operation and service level of trams. Therefore, it is necessary to give priority to trams at level crossings. However, trams Priority will inevitably affect the delay time of social vehicles at level crossings, so it is necessary to balance the contradiction between trams and social vehicles at level crossings. [0003] Patent application CN201610890925.7 proposes an intersection traffic control method based on the tram active operation control system. By actively controlling the speed of the tram, the moment when the tram arrives at the level crossing is just at...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08G1/087
CPCG08G1/087
Inventor 罗梅竹谷丰何维陈杨刘光勇
Owner HUNAN CRRC TIMES SIGNAL & COMM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products