A post-forging heat treatment process for 12cr2mo1v hydrogenation reactor forgings
A 12cr2mo1v, hydrogenation reactor technology, applied in the field of large forging process, can solve the problems of inability to eliminate the pinning effect of VC and other carbides, difficult to eliminate the phenomenon of coarse grains and mixed grains, delaying the production cycle, etc., and achieve uniform structure refinement and uniformity. Stable, finer grains, and the effect of reducing the number of normalizing times
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A post-forging heat treatment process for a 12Cr2Mo1V hydrogenation reactor forging comprises the following steps:
[0027] 1) One-time high temperature normalizing: After the forging is forged by a press, it is installed in a furnace at 720°C for 1h / 100mm, cooled to 300°C, and held for 1.5h / 100mm, then heated to 720°C, held for 1h / 100mm, and then the Raise the temperature to 1030°C and keep it warm for 2h / 100mm, then air-cool to 300°C and install the furnace.
[0028] 2) Primary isothermal annealing: After the furnace is installed, heat up to 720°C and keep it for 1h / 100mm, then raise the temperature to 950°C with power and keep it for 2.5h / 100mm. To below 250 ° C, out of the oven.
[0029] figure 1 Shown is the metallographic photograph of the forging obtained after heat treatment in Example 1. After the performance heat treatment of the hydrogenation reaction vessel forgings of the above post-forging heat treatment process, the grain size reaches grade 7.
Embodiment 2
[0031] A post-forging heat treatment process for a 12Cr2Mo1V hydrogenation reactor forging comprises the following steps:
[0032] 1) One-time high temperature normalizing: After the forging is forged by a press, it is installed in a furnace at 700°C for 1.5h / 100mm, cooled to 280°C, and held for 1.5h / 100mm, then heated to 700°C, held for 1.5h / 100mm, and then Raise the temperature to 1010°C with power and keep it warm for 3h / 100mm, then air-cool to 280°C and install the furnace.
[0033] 2) One-time isothermal annealing: After the furnace is installed, heat up to 700°C and keep it for 1.5h / 100mm, then raise the temperature to 940°C with power and keep it for 3h / 100mm. To below 230 ℃, out of the oven.
[0034] figure 2 Shown is the metallographic photograph of the forging obtained after heat treatment in Example 2. The forgings of the hydrogenation reaction vessel after the above post-forging heat treatment process have a grain size of 7 grades after performance heat treatme...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com