Construction method of a control device for arching at the bottom of a ballastless track tunnel
A ballastless track and control device technology, applied in tracks, roads, tunnels, etc., can solve the problem that the line smoothness cannot be guaranteed, and achieve the effect of ensuring the safety of tunnel construction and operation, high promotion value, and ensuring operation safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as Figure 1-Figure 2 As shown, the bottom part of the ballastless track tunnel mainly includes the tunnel bottom surrounding rock 1, on which the primary support 2, the secondary lining 3, and the inverted arch filling layer 4 are successively arranged above the tunnel bottom surrounding rock 1. A track bed slab 5 is laid on the arch filling layer 4 , a sleeper 6 is arranged on the track bed slab 5 , and a ballastless track 7 is installed on the sleeper 6 .
[0029] A control device for arching at the bottom of a ballastless track tunnel, comprising several vertical drills with a diameter of 10cm-30cm that are vertically driven from the ballast slab 5 into the tunnel bottom surrounding rock 1 after the construction of the ballast slab 5 is completed. Hole 8, the setting position of the vertical borehole 8 is relatively staggered from the laying position of the ballastless track 7, and the centerline of the vertical borehole 8 and the centerline of the ballastless ...
Embodiment 2
[0033] A construction method of a control device for arching the bottom of a ballastless track tunnel, including any one of the control devices for arching the bottom of a ballastless track tunnel, and the construction method is as follows:
[0034] Step 1: After the construction of the track bed slab 5 is completed, the vertical borehole 8 is vertically driven into the surrounding rock 1 at the bottom of the tunnel from the ballast slab 5, and the setting position of the vertical borehole 8 is consistent with the laying of the ballastless track 7 The positions are relatively staggered, and the centerline of the vertical borehole 8 is at least D=30cm away from the centerline of the ballastless track 7;
[0035] Step 2: laying a supporting pipe on the inner wall of the vertical borehole 8;
[0036] Step 3: Set strain gauges on the support pipe and check them regularly;
[0037] Step 4: When the stress results of the strain gauge tend to be stable, the vertical borehole 8 is gr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com