Seamless steel tube for nuclear power equipment and preparation method of seamless steel tube
A technology for seamless steel pipes and equipment, applied in the field of seamless steel pipes for nuclear power equipment and its preparation, can solve the problems of general performance and performance needs to be improved, and achieve good wear resistance, save manpower and cost, and shorten the production cycle
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A method for preparing seamless steel pipes for nuclear power equipment, the preparation steps of the method are as follows:
[0020] The first step: make a cylindrical tube blank, the tube blank is composed of C: 1.5 parts, Si: 1.9 parts, Mn: 4.5 parts, Pb: 0.1 parts, Bi: 0.1 parts, Nb: 0.2 parts, Re: 6 parts, P : 0.06 parts, Fe: 950 parts of these components;
[0021] Step 2: put the tube billet into the ring furnace for heating, the temperature of the ring heating furnace is 1280°C, the starting rolling temperature is 1200°C, the final rolling temperature is 960°C, and the tension reducing temperature is 970°C;
[0022] Step 3: Perform low-temperature tempering treatment, heat preservation at 250° C. for 2 hours, and then cool naturally to obtain seamless steel pipes for nuclear power equipment.
Embodiment 2
[0024] A method for preparing seamless steel pipes for nuclear power equipment, the preparation steps of the method are as follows:
[0025] The first step: make a cylindrical tube blank, the tube blank is composed of C: 3.3 parts, Si: 4.2 parts, Mn: 8.5 parts, Pb: 0.2 parts, Bi: 0.2 parts, Nb: 0.4 parts, Re: 12 parts, P : 0.15 parts, Fe: 1100 parts of these components;
[0026] Step 2: put the tube billet into the ring furnace for heating, the temperature of the ring heating furnace is 1300°C, the rolling start temperature is 1130°C, the final rolling temperature is 980°C, and the tension reducing temperature is 970°C;
[0027] Step 3: Perform low-temperature tempering treatment, keep warm at a temperature of 300°C for 3 hours, and then cool naturally to obtain seamless steel pipes for nuclear power equipment.
Embodiment 3
[0029] A method for preparing seamless steel pipes for nuclear power equipment, the preparation steps of the method are as follows:
[0030] The first step: make a cylindrical tube blank, the tube blank is composed of C: 1.8 parts, Si: 2.3 parts, Mn: 6 parts, Pb: 0.12 parts, Bi: 0.13 parts, Nb: 0.23 parts, Re: 8 parts, P : 0.09 parts, Fe: 980 parts of these components;
[0031] Step 2: put the tube billet into the ring furnace for heating, the temperature of the ring heating furnace is 1290°C, the starting rolling temperature is 1215°C, the final rolling temperature is 970°C, and the tension reducing temperature is 970°C;
[0032] Step 3: Perform low-temperature tempering treatment, heat preservation at 270° C. for 2.5 hours, and then cool naturally to obtain seamless steel pipes for nuclear power equipment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com