A method for quick replacement of large skips in coal mines
A skip and large-scale technology, which is applied in the field of rapid replacement of large skips in coal mines, can solve the problems of time-consuming, high cost, and large floor space, so as to reduce difficulty and workload, reduce load and floor space, and save civil engineering cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] Taking the hoisting system of the main shaft of a mine as an example, it uses a skip bucket with a load of 50 tons and a self-weight of about 57 tons. It has a two-stage split structure and an overall height of more than 21 meters. The traditional design scheme is to suspend the spare skip in sections on the first floor of the main shaft tower, increasing the local floor load of the main shaft tower by more than 57 tons; the wellhead casing needs to be disassembled to a height of more than 15 meters in the direction of replacing the skip Steel structures and tanks within the range; a set of lifting and transporting devices for moving the skip from the standby position to the vicinity of the wellhead casing needs to be set in the well tower. This method increases the fixed load of the well tower, and the cost of civil construction is high; a large number of casing steel structures need to be dismantled, and the disassembly operation takes a long time, and the installation...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com