Installation device of building beam column floor
A technology for installing equipment and beams and columns, which is applied in the processing of building materials, construction, building construction, etc., can solve the problems of high labor intensity, cumbersome and complicated process, and short time consumption, so as to reduce labor intensity and ensure personnel safety , the effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] In order to make it easy to understand the technical means, creative features, objectives and effects achieved by the present invention, the present invention will be further explained below in conjunction with specific drawings. It should be noted that the embodiments in the application and the features in the embodiments can be combined with each other if there is no conflict.
[0029] Such as Figure 1 to Figure 5 As shown, in order to achieve the above object, the present invention adopts the following technical solution: a building beam-column floor installation equipment, including a transport device 1, a circular plate 2, two limit cutting devices 3 and two grabbing devices 4, so The lower right end of the conveying device 1 is installed on the circular plate 2. Two limit cutting devices 3 are installed at the front and rear ends of the circular plate 2, and two grabbing devices 4 are installed at the left and right ends of the circular plate 2.
[0030] The conveyin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


