Combined air entraining facility suitable for stepped overflow high dam
A combined and stepped technology, applied in water conservancy projects, sea area projects, coastline protection, etc., can solve problems such as dam stability and safety hazards, and achieve the effects of reducing direct impact force, increasing contact area, and increasing aeration concentration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment 1: This embodiment is based on the Yunnan Lancang River Ahaihai Hydropower Station, which is located in the middle reaches of the Jinsha River at the junction of Yulong County (right bank) and Ninglang County (left bank) in Lijiang, Yunnan Province. It is planned for the middle reaches of the Jinsha River In the fourth step, the upstream is connected to the Liyuan Hydropower Station, and the downstream is the Jin'anqiao Hydropower Station. The project is a water conservancy and hydropower hub project that focuses on power generation, taking into account flood control, irrigation and other comprehensive utilization. In the test, the model of Ahaihai Hydropower Station was scaled to a scale of 1:60 and made of plexiglass. In the following example, one of the five holes in the Ahai overflow dam is used to illustrate the flow conditions.
[0023] The height h of the transition step 1 of the combined aeration facility in this embodiment 1 =33.34cm, width b 1 =2...
Embodiment 2
[0026] Embodiment 2: The height h of the transition step 1 of the combined aeration facility in this embodiment 1 =50.01cm, width b 1 =37.5cm. The transition step 1 is followed by 20 uniform steps 2, the height of which is h=16.67cm, and the width b=12.5cm. The uniform step 2 is followed by 6 arc-shaped aerated steps, where the height h of the vertical section 3 2=5.55cm, the vertical distance h between the vertical arc groove 6 and the vertical surface of the arc-shaped aeration step 3 =2.32cm, the vertical distance h between the horizontal arc-shaped groove 7 and the horizontal plane of the arc-shaped aeration step 4 =2.36cm, the length b of the first horizontal section 4 2 =2.08cm, the length b of the second horizontal section 5 3 =2.08cm.
[0027] Two measuring points are arranged on the vertical surface and the horizontal plane of the transitional step 1 for the test negative pressure; 10 measuring points are respectively arranged on the vertical surface and the hor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com