Ultrathick normalizing high-intensity pressure container steel plate and production method thereof
A steel plate production method and pressure vessel technology, which are applied in the field of steel products, can solve the problems of not being able to improve the rolled strength and thermal strength of steel plates, and cannot guarantee mechanical properties, so as to achieve good internal quality, good lamellar tear resistance, The effect of high production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0020] Example 1
[0021] The P355GH extra-thick normalized high-strength container steel of this embodiment is prepared from the following components by mass percentage:
[0022] C
[0023] Others are Fe and inevitable impurities.
[0024] The production and preparation method of the P355GH extra-thick pressure vessel steel of the present embodiment is as follows:
[0025] 1) Smelting process: After the raw molten iron is pretreated, it is smelted in a 120t top-bottom double blowing converter. After the converter is tapped, the ladle is blown with argon for 15 minutes and fed with aluminum wire for deoxidation treatment. The molten steel is sent to the LF refining furnace for refining, and then vacuumized in the VD furnace. Treatment, the vacuum time is 15 minutes, after the treatment, the calcium iron wire is fed 2m / t, and the argon is softly blown for 15 minutes after feeding the wire;
[0026] 2) Casting process: After the VD furnace treatment, the molten steel ...
Example Embodiment
[0035] Example 2
[0036] The P355GH extra-thick normalized high-strength container steel of this embodiment is prepared from the following components by mass percentage
[0037] C
[0038] Others are Fe and inevitable impurities.
[0039] The production and preparation method of the P355GH extra-thick normalized high-strength container steel of this embodiment is the same as that of the embodiment 1. The difference is that the thickness of the raw material blank after the vacuum electron beam welding of the 3-layer continuous casting blank is 830 mm, and the heating time of the composite blank in the heating furnace is 23 mm. Hour.
[0040]
[0041] The normalizing temperature was 912°C, and the furnace time was 230 minutes.
[0042] like figure 2 Shown: the metallographic structure at the composite interface has no obvious interface and delamination, and the microstructure reaches interatomic bonding after rolling.
Example Embodiment
[0043] Example 3
[0044] The P355GH extra-thick normalized high-strength container steel of this embodiment is prepared from the following components by mass percentage:
[0045] C
[0046] Others are Fe and inevitable impurities.
[0047] The production and preparation method of the P355GH extra-thick normalized high-strength container steel of this embodiment is the same as that of the embodiment 1. The difference is that the thickness of the raw material billet after the vacuum electron beam welding of the 3-layer continuous casting billet is 840 mm, and the heating time of the composite billet in the heating furnace is 24 mm. Hour.
[0048]
[0049] The normalizing temperature was 909°C, and the furnace time was 260 minutes.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap