Oil deposit development production optimization method and system based on connectivity method
A technology of reservoir development and optimization method, which is applied in the direction of design optimization/simulation, production fluid, earthwork drilling and production, etc., can solve problems such as optimization and improvement of reservoir production plan, achieve the effect of reducing water and increasing oil, improving water injection efficiency, Accurate saturation tracking and calculations yield dynamic results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0154] Example 2 With the help of reservoir numerical simulation technology, a positive-rhythm oil reservoir with high permeability zones with grid division of 21×21×2 was constructed. The grid size is DX=DY=20m, DZ=10m, and there are 9 wells in the reservoir 5 injection and 4 production, separate injection and combined production, the permeability field distribution is as follows Figure 5a , Figure 5b As shown, the initial reservoir saturation is 0.2, and the oil-water viscosities are 1.0 and 20.0 mPa·s, respectively. The production dynamic simulation calculation of the reservoir was carried out by using mature digital simulation software. The simulated production time was 900 days, the overall injection-production balance of the reservoir was achieved, and the water cut of the final block reached 82.0%.
[0155] Using inter-well connectivity of multi-layer reservoirs to simulate the production performance in the first 900 days, it takes 0.22 seconds for one calculation, w...
Embodiment 3
[0159] Example 3 involves an overseas multi-layer water flooding oil field. 12 wells in an experimental area have 6 injections and 6 productions. Simulation calculations are carried out. The reservoir is divided into three layers in total, with separate injection and production. Through automatic history matching, the previous 2011 days, Invert model parameters, output information such as water injection splitting and oil displacement efficiency at the last moment, and then adjust the reservoir development plan.
[0160] The historical fitting of cumulative oil production and water cut production dynamics in the block is as follows: Figure 13a , Figure 13b As shown, the figure shows that the oil-water dynamics of the reservoir have been well fitted, and the fitting correlation coefficient has reached more than 95%. At the same time, according to the parameter field results after inversion, the simulation outputs the water injection splitting information of each layer at the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com