An installation method and steel girder technology, applied in bridges, bridge construction, bridge materials, etc., can solve the problems of difficult transfer of large construction machinery, increased investment, and long construction period, so as to reduce the risk of high-altitude operations, reduce investment, and reduce input effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] Example 1, please refer to Figure 1 to Figure 4 , this embodiment only installs steel beams:
[0055] A method for installing a steel pipe arch steel girder. The steel pipe arch includes two arch rings separated on both sides, and the two ends of the arch ring are respectively stationed on both banks; the installation steps of the steel girder include:
[0056]Step 11: Set up a secondary hoisting platform between the inner sides of the arch rings on both sides, lift the first steel girder closest to the shore and lower the first steel girder from the gap between the two arch rings to the second on the bracket on the hoisting platform;
[0057] Step 12: Lift the bracket from the outside of the two arch rings, bring the first steel beam to the installation location for installation, install the tail of the first steel beam on the steel pier, install the first steel beam support on the pad On Shishang, obtain the three-dimensional space coordinates of the coordinate con...
Embodiment 2
[0065] Example 2, please refer to Figure 1 to Figure 4 , this embodiment installs the steel beam and the suspender at the same time:
[0066] A method for installing a mid-support steel pipe arch steel beam and a suspender, comprising the following installation steps:
[0067] Step 21, set up a secondary hoisting platform between the inner sides of the arch rings on both sides, place a suspender on the first steel girder closest to the shore and anchor the lower anchor point of the suspender to the first steel girder, and place the Hoist the first steel beam and boom and lower the first steel beam segment to the bracket on the secondary hoisting platform from the gap between the arch rings on both sides;
[0068] Step 22: Lift the bracket from the outside of the two arch rings, bring the first steel beam to the installation location for installation, install the tail of the first steel beam on the steel pier, install the first steel beam support on the pad On Shishang, obta...