High-voltage circuit breaker spring preparation process

A high-voltage circuit breaker and preparation process technology, applied in the direction of manufacturing tools, circuits, heat treatment equipment, etc., can solve the problems that the change of self-height change P2 load cannot meet the standard, etc., achieve slow preheating loss, improve production accuracy, The effect of reducing wear

Active Publication Date: 2019-04-02
ZHEJIANG JINCHANG SPRING CO LTD
View PDF8 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, when the high-voltage circuit breaker spring is prepared by the general hot coil spring processing technology, after the spring is under strong pressure for 24 hours, the change of its own height and the change of P2 load cannot meet the standard

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-voltage circuit breaker spring preparation process
  • High-voltage circuit breaker spring preparation process
  • High-voltage circuit breaker spring preparation process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0063] The difference between Examples 18-37 and Example 1 is that the raw materials for preparing the wear-resistant layer are listed in the following table in parts by weight:

[0064]

[0065]

[0066] The difference between embodiment 38-41 and embodiment 1 is: when preparing the heat insulation layer, the thermometer in the step (1) is the following table:

[0067]

temperature

Example 38

85

Example 39

90

Example 40

95

Example 41

100

[0068]The difference between Examples 42-45 and Example 1 is that when preparing the wear-resistant layer, the thermometer in step (2) is as follows:

[0069] Example

temperature

Example 42

90

Example 43

100

Example 44

110

Example 45

120

[0070] The difference between Examples 46-49 and Example 1 is that the fixed time in step (2) is calculated as the following table when preparing the heat insulation layer:

[0071] ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-voltage circuit breaker spring preparation process, mainly comprising the following steps: sorting, blanking, tip grinding, heating, spring coiling, quenching treatment,tempering treatment, end face grinding treatment, shot blasting, flaw detection, erection treatment, surface treatment, marking and packaging; wherein a thermal compression treatment is performed onthe spring subjected to the tempering treatment by using a thermal compression device. In the high-voltage circuit breaker spring preparation process disclosed by the invention, the thermal compression treatment is performed on the spring subjected to the tempering treatment, so that the performance of the spring is improved, and the precision is improved.

Description

technical field [0001] The invention relates to the technical field of spring preparation, in particular to a high-voltage circuit breaker spring preparation process. Background technique [0002] High-voltage circuit breakers are the main parts of high-voltage power transmission and transformation equipment. Whether they can operate safely plays a key role in ensuring the safe, stable and reliable operation of the entire high-voltage power transmission and transformation network. The high-voltage circuit breaker spring is the core of the operating mechanism. Parts, its importance can be seen. Due to the reliability of the spring operating mechanism of the circuit breaker, the requirements for the spring load deviation are generally very high, which are generally higher than the super precision of the national standard. After the spring is pressed for 24 hours, the free height change is ≤1%×Ho, and the P2 load change is ≤ 2% x P2. It is also required that after the spring ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H01H11/00C21D1/18C21D9/02C09D163/00C09D177/00C09D127/18C09D7/61
CPCC08K3/042C08K2003/385C08L2205/03C09D7/61C09D163/00C21D1/18C21D9/02H01H11/00C08L77/00C08L27/18C08K3/00C08K3/34C08K3/08C08K3/38
Inventor 费庆民楼昆潮侯亦锋
Owner ZHEJIANG JINCHANG SPRING CO LTD