Method for overall evaluation of power grid planning

A power grid planning and overall technology, applied in the direction of instrumentation, technical management, data processing applications, etc., can solve the problem of unsatisfactory dispatching and operation, evaluation and analysis of typical operation modes that cannot meet the requirements of power system planning and analysis, and difficulty in adapting to new energy access. Deterministic analysis requirements and other issues to achieve good environmental benefits

Inactive Publication Date: 2019-04-12
RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER +1
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 2) The output of renewable new energy sources such as wind power and solar photovoltaic power generation depends on the weather conditions, and cannot be controlled like conventional units during dispatch operation. This brings many challenges to the dispatch operation of the system, including the impact on the start and stop of the unit, The demand for system peak-shaving capacity and peak-shaving capability, as well as the need for coordination and cooperation between different types of units, etc.
[0005] 3) Due to the low prediction accuracy of renewable energy output at present, the randomness and uncontrollability of renewable energy have brought many uncertain factors to the system scheduling operation. Objectively, the scheduling plan is required to be more flexible and able to accommodate various types of renewable energy. Possibility of output
[0006] At present, the power system operation simulation results cannot be effectively connected with the power flow calculation in power grid planning. The power flow calculation generally uses four typical methods: summer large, summer small, winter large, and winter small, which does not truly reflect the transmission channels or The section is heavily loaded, and the refinement level of power grid planning needs to be improved urgently. It is necessary to fully consider the random output characteristics of new energy in the stage of power grid planning scheme formulation and safety and stability verification, so as to improve the pertinence of power grid planning work
[0007] With the expansion of cross-regional power grid interconnection in my country, the increasingly complex grid structure, and the rapid development of new energy sources, the impact of multi-mode power supply operation modes on power grid operation modes will become more complex and diverse. The requirements of system planning analysis, the traditional manual decision-making method is difficult to adapt to the uncertainty analysis requirements brought about by the access of new energy, it is necessary to study the key technology of power grid planning based on the refined operation simulation technology of the power system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for overall evaluation of power grid planning
  • Method for overall evaluation of power grid planning
  • Method for overall evaluation of power grid planning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0065] Such as figure 1 As shown, this application provides a method for overall evaluation of power grid planning, the method includes:

[0066] The present invention provides a method for overall evaluation of grid planning, the method comprising:

[0067] S1: Analyze N-1, N-2 pass rate, power flow distribution rationality index, short-circuit current rationality index, variable capacity-to-load ratio, and electricity reliability index to evaluate the safety of power grid planning.

[0068] The implementation principle of step S1 is as follows:

[0069] S11: Obtain the ratio of the transmission lines meeting the N-1 and N-2 standards, and calculate the N-1 and N-2 pass rate score=N-1 and N-2 pass rate*100.

[0070] This indicator is used to evaluate the proportion of a certain transmission line that meets the N-1 and N-2 standards, and to verify whether the power grid structure strength and operation mode meet the requirements for safe operation, reflecting the safety of p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for overall evaluation of power grid planning. The method comprises the steps of S1, analyzing N-1 and N-2 passing rates, a power flow distribution reasonableness index, a short circuit current reasonableness index, a variable capacitance load ratio and a power utilization reliability index, and evaluating power grid planning safety; s2, analyzing the static evaluation index, the dynamic evaluation index and the investment efficiency, and evaluating the power grid planning economy; s3, analyzing the admission capability of renewable energy sources, carbon emission and environmental influence, and evaluating the environmental protection property of power grid planning; s4, analyzing the maximum annual average growth rate, the load growth margin, the network expansion margin and the network renewable energy grid connection margin of the unified dispatching load, and evaluating the flexibility of power grid planning; and s5, synthesizing the evaluation results of the steps S1-S4 to form an overall power grid planning evaluation report;; and a basis is provided for selecting a most reasonable planning scheme by combining four types of evaluation indexesincluding a safety index, an economic index, an environmental protection index and a flexibility index.

Description

technical field [0001] The invention mainly relates to related fields such as power system operation analysis and reliability evaluation, and specifically relates to a method for overall evaluation of power grid planning. Background technique [0002] With the rapid development of new energy in my country, the randomness and intermittent nature of new energy output have brought a greater impact on the planning and operation of the power system. Due to the randomness, volatility and uncertainty of new energy output, large-scale new energy power generation grid connection will have a significant impact on the power output structure, operating form, energy saving and economical aspects of the power system: [0003] 1) When large-scale new energy is connected to the grid, the system has uncertainties not only on the load side, but also on the power generation side. Therefore, it is necessary to reserve more reserves to cope with the uncertainty of new energy output in dispatchi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06Q50/06
CPCG06Q10/04G06Q10/06312G06Q10/06393G06Q50/06Y02E40/70Y04S10/50Y02P90/82
Inventor 田鑫李雪亮吴健李琨曾军赵龙王艳郑志杰张杰牟宏汪湲高效海张丽娜张玉跃付一木魏鑫袁振华
Owner RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products