A Method for Group Control of Urban Pipeline Construction Site
A technology of urban pipelines and on-site groups, applied in the direction of comprehensive factory control, comprehensive factory control, program control, etc., can solve problems such as low efficiency and poor precision, and achieve the effect of simple measurement operation and improved work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0038] (1) Reference image 3 , first place the spatial point coordinate measuring equipment (such as a total station) on the bisector of the angle between the two pipes to be measured, and try to make the laser points concentrated when measuring the pipe walls and nozzles of the two pipes. Turn on the WIFI hotspot of the total station, search the hotspot on the PC side, and establish WIFI wireless communication. Measure at least 10 points on the wall of the first existing pipeline 1, first measure the coordinates of two points approximately along the axis: the first measurement point 7 is far away from the intersection of pipeline axes, and the second measurement point 8 is close to the intersection of pipeline axes. The remaining points evenly distributed on the pipe wall are then measured. Measure at least 4 uniformly distributed points on the outer circumference of the nozzle of the first existing pipeline 1, first measure the point at 12 o'clock as a reference point. Ne...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


