Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of prefabricated hollow pier installation structure

A construction method and technology for installing structures, which are applied in the erection/assembly of bridges, buildings, bridge construction, etc., can solve the problems of insufficient connection strength between prefabricated hollow piers and pier-column foundations, and do not involve prefabricated hollow piers and formwork installation and positioning technologies. Achieve the effect of improving concrete pouring construction environment, high reliability of hoisting connection, and improving efficiency and quality

Active Publication Date: 2020-12-25
ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF19 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above construction technology solves the problem of insufficient connection strength between the prefabricated hollow pier and pier column foundation to a certain extent, but does not involve the prefabricated hollow pier and formwork installation and positioning technology, and there is still room for improvement in the structural integrity

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of prefabricated hollow pier installation structure
  • Construction method of prefabricated hollow pier installation structure
  • Construction method of prefabricated hollow pier installation structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0035] refer to figure 1 As shown, the construction method of the prefabricated hollow pier installation structure includes the following construction steps:

[0036] 1) Construction preparation: prepare the prefabricated hollow pier 1 that meets the requirements, and carry out the construction of the base layer 2 and the cap 3, and determine the concrete mix ratio;

[0037] 2) Binding construction of the annular steel cage 4: set the bottom support plate 69 at ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of a prefabricated hollow pier installation structure. The construction method comprises the following steps: 1) construction preparation; 2) ring steelbar cage binding construction; 3) prefabricated hollow pier hoisting construction; 4) prefabricated hollow pier positioning and connecting; 5) foundation steel mould layout; and 6) foundation concretepouring. The construction method has the advantages that not only can the efficiency and quality of the binding construction of a ring steel bar cage be improved, but also the difficulty of the binding and positioning of the steel bar cage can be effectively reduced; the hoisting connection reliability of a prefabricated hollow pier is high and the hoisting construction difficulty is low, the hoisting construction efficiency can be improved, and the hoisting positioning accuracy can be improved; a prefabricated hollow pier has high connection strength with a bearing cap and a positioning pierand positioning is accurate, which can greatly improve the integrity of the foundation part of the prefabricated hollow pier and optimize the structural stress; and the construction method can effectively improve the accuracy of the installation and positioning of a foundation steel mould, enhance the integrity of the foundation steel mould structure, and improve the efficiency of the formwork erecting construction.

Description

technical field [0001] The invention relates to a construction method of a prefabricated hollow pier installation structure that can improve the quality of on-site construction and the integrity of the construction structure, reduce the difficulty of environmental protection, and improve the efficiency of on-site construction. It belongs to the field of bridge engineering and is suitable for prefabricated hollow pier installation projects. Background technique [0002] The prefabricated hollow pier of the bridge adopts factory prefabrication and on-site assembly technology, which can speed up the construction progress while improving the mechanized construction level, reduce the impact of construction on the surrounding environment, and has a good engineering application prospect. However, during the construction of the prefabricated hollow pier installation structure, the construction quality is often affected by the hoisting connection, spatial positioning accuracy, connect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 江仲明陈智薛斌韩健肖必忠郭文镖姚琪
Owner ANHUI HIGHWAY BRIDGE ENG CO LTD