Dam bin surface green cutting device and construction method thereof

A technology for flushing and dams, which is applied in water conservancy projects, sea area engineering, infrastructure engineering, etc., can solve the problems of restricting the efficiency of flushing, high labor intensity, and affecting the quality of flushing, so as to reduce human resource investment and maximize safety Economic benefits, the effect of reducing manual intervention

Pending Publication Date: 2019-07-05
CHINA THREE GORGES PROJECTS DEV CO LTD
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the concrete treatment between the concrete layers of the dam mainly relies on manual flushing of the warehouse surface with the flushing water gun, and the deep flushing of the part with a long intermittent period using the sand gun for deep flushing or manual chiseling with the pneumatic pick. Although the above construction methods are basically It can meet the requirements of concrete interlayer treatment, but it relies too much on manpower, and the labor intensity is high. Most of the hair removal personnel belong to the grassroots workers, and the ability to grasp the quality of concrete interlayer treatment is insufficient, and it is prone to underflush (concrete milk skin has not been removed) or Problems such as excessive flushing (concrete pebbles or medium-sized stones are exposed in large areas), waste water, milk skin, and sand and gravel brought up by high-pressure water guns and wind sand guns are likely to cause injury safety accidents, and the warehouse surface needs to be gradually cleared out later. , which seriously restricts the efficiency of wool flushing, affects the quality of wool flushing, and causes a waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dam bin surface green cutting device and construction method thereof
  • Dam bin surface green cutting device and construction method thereof
  • Dam bin surface green cutting device and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] see Figure 1-4 , a kind of dam warehouse face flushing device, it comprises preparation device 1 and operating device 28, and described preparation device 1 comprises high-pressure water pump 2, air compression device 3 and central centralized control center 4, and the water inlet of described high-pressure water pump 2 Connected with the water storage tank 5, the water outlet of the high-pressure water pump 2 is connected with a high-pressure water outlet pipe 21, and the air outlet of the air compression device 3 is connected with a wind-sand outlet pipe 22, and the wind-sand outlet pipe 22 is simultaneously used for providing The sand box 11 of sand material is connected with the small stone box 12 for providing stone materials; the operating device 28 includes a high-pressure water gun 31 and an air sand gun 32 connected side by side, and the high pressure water gun 31 and the air sand gun 32 are provided with a water sand gun adjustment device 38, the high-pressur...

Embodiment 2

[0050] The construction method of the dam bin face flushing device comprises the following steps:

[0051] The first step is preliminary preparation. According to different flushing conditions, a large number of high-definition pictures of concrete surfaces that meet the quality of flushing are collected for intelligent algorithm video training to obtain high-definition standard pictures with the best flushing effect, and input to the central control center 4 for convenience. The miniature high-definition camera 35 continuously takes photos and compares and analyzes with the standard pictures when washing the hair, and judges in real time whether the washing effect meets the standard requirements;

[0052] In the second step, the operating device 28 is placed on the surface of the flushing chamber, the preparation device 1 is placed on the template or the adjacent chamber surface, and the first waste water outlet pipe 43 and the waste water inlet pipe 26, the high-pressure wate...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a dam bin surface green cutting device and a construction method thereof. The dam bin surface green cutting device comprises a preparation device and an operation device, wherein the preparation device comprises a high-pressure water pump, an air compression device and a central centralized control center, a water inlet of the high-pressure water pump is connected with a water storage tank, a water outlet of the high-pressure water pump is connected with a high-pressure water outlet pipe, an air outlet of the air compression device is connected with an air sand outlet pipe, and the air sand outlet pipe is simultaneously connected with a sand box for providing sand materials and a small stone box for providing stone materials; and the operation device comprises a high-pressure water gun and an air sand gun which are connected side by side. According to the intermittent time and strength of concrete on the dam bin surface, single or double effects of the high-pressure water gun and the air sand gun are selected to perform green cutting on the concrete on the dam bin surface to achieve the best green cutting effect.

Description

technical field [0001] The invention relates to the technical field of dam concrete construction, in particular to a dam concrete bin surface flushing device and a construction method. Background technique [0002] Today's dam construction technology is becoming more and more mature, and it is gradually developing towards high dams above 300m. The interlayer treatment of high dam concrete is related to the interlayer bonding quality of the dam, which has a great impact on the anti-seepage of the dam concrete and the overall safety of the structure, which in turn is related to the For the permanent and safe operation of the dam throughout its life cycle, the requirements for the treatment of the construction joints between the concrete layers of the dam are becoming more and more stringent. [0003] At present, the concrete treatment between the concrete layers of the dam mainly relies on manual flushing of the warehouse surface with the flushing water gun, and the deep flush...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02B7/02E02D15/02
CPCE02B7/02E02D15/02
Inventor 乔雨王义锋李华杨宁蔡伟杰谭高文张钊李文涛李果吴林强
Owner CHINA THREE GORGES PROJECTS DEV CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products