Stone curtain wall assembling type angle steel lattice keel support system and construction method thereof
A technology of support system and stone curtain wall, applied in the direction of walls, building components, building structures, etc., can solve the problems of inability to achieve architectural modeling requirements, high construction costs, waste of materials, etc., to improve construction quality, improve construction quality, reduce The effect of stacking time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0066] Such as Figure 1-3 Commonly shown, the stone curtain wall assembled angle steel lattice keel support system includes several keel frames, and the keel frames include several rectangular horizontal keel frames arranged horizontally, all of which are arranged vertically Two first horizontal keels 1 and two second horizontal keels 2 are set, and the adjacent first horizontal keels 1 and second horizontal keels 2 are welded end to end, and each corresponding angle of all rectangular horizontal keels is welded separately There is a vertical keel 3, and a slanting keel 4 is fixed between the upper and lower adjacent second horizontal keels 2, and the slanting keel 4 is welded on two adjacent vertical keels 3, and a vertical keel 3 is provided at both ends. The connecting end 5 is provided with two vertically arranged elliptical bolt holes 7 on the connecting end 5 located at the lower end, and an angle steel 6 is connected between adjacent two dragon frames, and the lower en...
Embodiment 2
[0073] Such as Figure 4 , Figure 5 and Figure 6 Commonly shown, the construction method of the stone curtain wall assembled angle steel lattice keel support system, the construction method includes the following steps:
[0074] Step S1: Set elevation control points and positioning control lines according to the corresponding benchmarks, and position the rear embedded parts 9, channel steel adapters 8, transverse keels, etc. of the curtain wall;
[0075] Step S2: According to the plan view of the embedded part 9, check the actual position of the embedded part 9 on site, judge whether the embedded part 9 is qualified, and make a record of the position deviation of the embedded part 9. Anchoring with chemical bolts;
[0076] Step S3: Install the channel steel adapter 8 according to the design requirements and positioning the plumb line control line;
[0077] Step S4: Determine the size and position of the vertical keel 3, the first horizontal keel 1, the second horizontal ...