The excavation method of symmetrical wheel-shaped ground survey and leveling tunnel based on miniature tbm roadheader

A kind of roadheader and miniature technology, which is used in earth-moving drilling, mining equipment, tunnels and other directions, can solve the problems of high construction cost, poor stability of the cavern, single shape of the cavern, etc., and achieves a smooth and smooth excavation surface, easy to move and lift. Good effect of transportation and cavern stability

Active Publication Date: 2020-09-29
POWERCHINA XIBEI ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art, provide a symmetrical wheel-shaped ground survey leveling hole excavation method based on a miniature TBM roadheader, overcome 1 in the prior art: the tunnel construction in a narrow space still stays at manual drilling and blasting, every day The excavation speed is only 0.5m ~ 1.5m, the construction cost is high, the risk is high, and the construction accident rate is high; 2: The traditional manual drilling and blasting method has low efficiency and long exploration time, which cannot meet the needs of planning and design progress nodes, and the pyrotechnic Difficult supply of materials, soaring labor costs, 3: Due to the large changes in the lithology of the composite formation, the traditional drilling and blasting method is difficult to control the shape of the section, the stability of the cavern is poor, and the shape of the cavern is single.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The excavation method of symmetrical wheel-shaped ground survey and leveling tunnel based on miniature tbm roadheader
  • The excavation method of symmetrical wheel-shaped ground survey and leveling tunnel based on miniature tbm roadheader

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0033] It should be noted that the structures, proportions, sizes, etc. shown in this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the conditions for the implementation of the present invention. Any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope covered by the technical contents disclosed in the present invention without affecting the functions and objectives of the present invention.

[0034] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present invention without any su...

Embodiment 1

[0037] The invention discloses a method for digging a symmetrical wheel-shaped ground survey leveling hole based on a miniature TBM roadheader, which includes the following steps:

[0038] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a micro TBM construction platform at the position of the first ground survey leveling cave entrance, where the micro TBM construction platform can move up and down;

[0039] Step 2) Hoist the micro-TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the micro-TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;

[0040] Step 3) Align the micro TBM roadheader with the center line of the entrance of the first ground survey leveling hole, start the micro TBM roadheader to e...

Embodiment 2

[0044] The invention discloses a method for digging a symmetrical wheel-shaped ground survey leveling hole based on a miniature TBM roadheader, which includes the following steps:

[0045] Step 1) Carry out construction stakeout, determine the actual position of the entrance of the first ground survey leveling hole on the mountain, and then build a micro TBM construction platform at the position of the first ground survey leveling cave entrance, where the micro TBM construction platform can move up and down;

[0046] Step 2) Hoist the micro-TBM roadheader to the entrance of the first ground survey leveling hole, and set it on the micro-TBM construction platform described in step 1); use a total station or compass for positioning, and determine the excavation direction of the first ground survey leveling hole and slope;

[0047] Step 3) Align the micro TBM roadheader with the center line of the entrance of the first ground survey leveling hole, start the micro TBM roadheader to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a symmetrical wheel-shaped geological exploration adit tunneling method based on a miniature TBM. By the adoption of the method, the requirements on small disturbance of surrounding rock, good stability of cavities, level and smooth tunneling faces, accurate positioning and no over-excavation can be met, and the effects of high efficiency, high quality and technical feasibility and the economic and reasonable, safe and environment-friendly effects are achieved. According to the symmetrical wheel-shaped geological exploration adit tunneling method, the miniature TBM withthe diameter of 1.0 m is utilized and has the beneficial effects of light weight, dexterity, easy moving and lifting and the like, and the equipment power of the miniature TBM is relatively small, sothat the number of supporting facilities used is relatively small, and the miniature TBM is used in mountain valleys and narrow areas and has a wide range of applications; and a geological exploration adit obtained by the tunneling method is in a symmetrical wheel shape and has the beneficial effects of good stability of the cavity, high utilization rate of the cavity, less excavation and the like compared to existing square or rectangular or circular adits.

Description

technical field [0001] The invention belongs to the field of preliminary geological exploration of water conservancy and hydropower projects, and in particular relates to a method for excavating a symmetrical wheel-shaped geological survey flat tunnel based on a miniature TBM roadheader, in particular to a method for digging a symmetrical wheel-shaped ground survey flat tunnel based on a micro-TBM roadheader with a diameter of 1.0 m. Background technique [0002] In recent years, with the huge demand for water resource development in the western region, the rational development of water resources such as "transmitting power from west to east" and "transmitting Tibetan power to outside" has become a major issue in ensuring my country's energy security, improving energy structure, and optimizing regional water resource allocation. strategic move. Laxiwa, Jinping, Xiaowan and other 300m-level hydropower stations have been built and put into operation; currently in the Qinghai-Ti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D9/10
CPCE21D9/00E21D9/10
Inventor 赵志祥王有林赵悦
Owner POWERCHINA XIBEI ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products