Sandwich structure composite material and preparation method thereof
A composite material and sandwich technology, applied in the field of sandwich structure composite material and its preparation, can solve the problems of poor bending resistance, poor tensile performance, low strength, etc. Performance and impact resistance, effect of high specific strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0029] The invention provides a preparation method of a sandwich composite material. The structure of the sandwich composite see Figure 1-2 , specifically including a first surface layer 1, a second surface layer 2, and a sandwich layer 3 between the first surface layer 1 and the second surface layer 2; the first surface layer 1 and the second surface layer The two surface layers 1 are carbon fiber woven cloth; the sandwich layer 3 includes a matrix 31 and aluminum oxide hollow balls 32 distributed in the matrix 31; the matrix 31 is aluminum or aluminum alloy.
[0030] The preparation method of the above-mentioned sandwich composite material comprises the following steps:
[0031] S1. Provide prefabricated molds.
[0032] For prefabricated structures, see image 3 shown. exist image 3 In , the downward triangle represents the liquid inlet, and the upward triangle represents the gas outlet. Of course, it can be understood that the specific structure of the prefabricated...
Embodiment 1
[0055] Supplied prefabricated.
[0056] Aluminum oxide hollow spheres (diameter 3mm, wall thickness 105μm, nominal density 0.52g / cm 3 , the true density is 0.87g / cm 3 ), and the carbon fiber woven cloth of the first surface layer and the second surface layer (single layer, see Figure 4 ) into the prefabricated mold, and the aluminum oxide hollow spheres are evenly distributed, and two layers of carbon fiber woven cloth are located on both sides of the aluminum oxide hollow sphere stack.
[0057] Put the prefabricated mold into an infiltration furnace for preheating, and heat it to 575° C., and keep it warm for 1 hour.
[0058] Add the melted A356 aluminum alloy melt into the prefabricated mold in the infiltration furnace from the liquid inlet, and apply a pressure of 35MPa to the pressure head at the same time; keep the temperature at 575°C, keep the pressure, and the temperature in the furnace, heat and maintain pressure 1 hour.
[0059] Finally, unmould after cooling. ...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Wall thickness | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap