Sewage prediction system and sewage prediction method in production
A sewage and production process technology, applied in forecasting, chemical instruments and methods, water/sewage multi-stage treatment, etc., can solve the problems of small forecasting range and single forecasting function, achieve appropriate treatment intensity, timely sewage treatment, and avoid drugs wasteful effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Please refer to figure 2, the application discloses a sewage forecasting system in production, which includes a regulating tank 11, a cooling tower 12, a dosing device 13, an air flotation device 14, a biochemical tank 15, a secondary settling tank 16, a sludge concentration tank 17, and a sludge Dehydration room 18, intermediate tank 19, power recorder 21, processor 22 and controller 23. They will be explained separately below.
[0059] The regulating pool 11 is used to receive the sewage generated in the production process of the production equipment, and regulate the amount and quality of the sewage. In general, the quantity and quality of the sewage discharged during the production process have great changes in different time periods. In order to make the back-end sewage treatment process work normally, the discharged sewage should pass through a pool with a certain capacity and stay for a certain period of time. Make the peak flow or high-concentration sewage mi...
Embodiment 2
[0075] Please refer to image 3 , the present application provides a sewage forecasting system in production, including a power recorder 21 and a processor 22 .
[0076] The power recorder 21 is used to acquire power consumption data information during the production process of the production equipment. Specifically, the power recorder is used to connect with the production equipment to obtain the power consumption data information of the production equipment in real time. The power consumption data information may include the power value, voltage value, current value, current phase angle, voltage phase angle, One or more of power spectrum and harmonic power spectrum characteristics.
[0077] The processor 22 is connected with the power recorder 21, and is used to predict the information of the sewage generated in the production process of the production equipment according to the electricity data information, and / or, the information of the sewage in one or more links in the ...
Embodiment 3
[0081] Please refer to Figure 4 , On the basis of the sewage forecasting system disclosed in Embodiment 2, the present application discloses a sewage forecasting method in production, which mainly includes steps S310-S320, which will be described respectively below.
[0082] In step S310, the power recorder 21 obtains the electricity consumption data information during the production process of the production equipment. The power usage data information may include power values, voltage values, current values, current phase angles, and voltage phase angles that vary with time.
[0083] Step S320, the processor 22 predicts the information of the sewage generated in the production process of the production equipment according to the electricity consumption data information, and / or the information of the sewage in one or more links in the sewage treatment process; wherein the sewage information includes the amount of sewage and / or sewage water quality.
[0084] It should be n...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


