Unlock instant, AI-driven research and patent intelligence for your innovation.

Sewage prediction system and sewage prediction method in production

A sewage and production process technology, applied in forecasting, chemical instruments and methods, water/sewage multi-stage treatment, etc., can solve the problems of small forecasting range and single forecasting function, achieve appropriate treatment intensity, timely sewage treatment, and avoid drugs wasteful effect

Active Publication Date: 2019-08-30
剑科云智(深圳)科技有限公司
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The technical problem mainly solved by the present invention is how to improve the situation of single prediction function and small prediction range existing in the existing sewage prediction treatment process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Sewage prediction system and sewage prediction method in production
  • Sewage prediction system and sewage prediction method in production
  • Sewage prediction system and sewage prediction method in production

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0058] Please refer to figure 2, the application discloses a sewage forecasting system in production, which includes a regulating tank 11, a cooling tower 12, a dosing device 13, an air flotation device 14, a biochemical tank 15, a secondary settling tank 16, a sludge concentration tank 17, and a sludge Dehydration room 18, intermediate tank 19, power recorder 21, processor 22 and controller 23. They will be explained separately below.

[0059] The regulating pool 11 is used to receive the sewage generated in the production process of the production equipment, and regulate the amount and quality of the sewage. In general, the quantity and quality of the sewage discharged during the production process have great changes in different time periods. In order to make the back-end sewage treatment process work normally, the discharged sewage should pass through a pool with a certain capacity and stay for a certain period of time. Make the peak flow or high-concentration sewage mi...

Embodiment 2

[0075] Please refer to image 3 , the present application provides a sewage forecasting system in production, including a power recorder 21 and a processor 22 .

[0076] The power recorder 21 is used to acquire power consumption data information during the production process of the production equipment. Specifically, the power recorder is used to connect with the production equipment to obtain the power consumption data information of the production equipment in real time. The power consumption data information may include the power value, voltage value, current value, current phase angle, voltage phase angle, One or more of power spectrum and harmonic power spectrum characteristics.

[0077] The processor 22 is connected with the power recorder 21, and is used to predict the information of the sewage generated in the production process of the production equipment according to the electricity data information, and / or, the information of the sewage in one or more links in the ...

Embodiment 3

[0081] Please refer to Figure 4 , On the basis of the sewage forecasting system disclosed in Embodiment 2, the present application discloses a sewage forecasting method in production, which mainly includes steps S310-S320, which will be described respectively below.

[0082] In step S310, the power recorder 21 obtains the electricity consumption data information during the production process of the production equipment. The power usage data information may include power values, voltage values, current values, current phase angles, and voltage phase angles that vary with time.

[0083] Step S320, the processor 22 predicts the information of the sewage generated in the production process of the production equipment according to the electricity consumption data information, and / or the information of the sewage in one or more links in the sewage treatment process; wherein the sewage information includes the amount of sewage and / or sewage water quality.

[0084] It should be n...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a sewage prediction system and a sewage prediction method in production. The sewage prediction system mainly comprises a power recorder and a processor, wherein the power recorder is used for acquiring power utilization data information in the production process of production equipment, and the processor is used for predicting information of sewage generated in the production process of the production equipment and / or information of sewage in one or more links in the sewage treatment process according to the power utilization data information. As the sewage informationgenerated in the production process is predicted by using the power utilization data information in the production process of the production equipment, a user can timely and accurately obtain the sewage generation amount in the next stage and the change condition of sewage quality components in each sewage treatment link according to a prediction result, and a sewage accurate treatment decision basis and enough sewage treatment medicine reagent preparation time are provided for the user, thus effectively avoiding the situations of medicine waste, electricity consumption increase, poor effluentquality and high cost caused by untimely sewage treatment preparation process in the prior art.

Description

technical field [0001] The invention relates to the technical field of sewage treatment, in particular to a sewage forecasting system and a sewage forecasting method in production. Background technique [0002] With the continuous acceleration of urbanization and industrialization, my country's water environment has been severely damaged and has a tendency to continue to deteriorate. Sewage discharge not only seriously affects the daily life of residents, but also destroys the ecological balance of nature. In order to reduce the discharge of sewage, sewage treatment plants have been established all over the country. However, there are still problems of excessive power consumption and high operating costs in the sewage treatment process. Therefore, it is necessary to study the optimization control of sewage treatment process to achieve energy saving and consumption reduction It is of great significance and is an inevitable development trend of the sewage treatment industry i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04C02F9/14
CPCC02F9/00C02F2209/001G06F2219/10G06Q10/04
Inventor 孙煜皓
Owner 剑科云智(深圳)科技有限公司