A technology of underground diaphragm wall and construction method, applied in sheet pile wall, foundation structure engineering, construction and other directions, can solve the problems of reducing bearing capacity, end bearing capacity and pile side friction resistance, slow construction speed, etc., to achieve low cost , high quality, fast construction effect

Inactive Publication Date: 2003-02-26
石午江
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method has the following disadvantages: the first, the construction speed is very slow
The speed of mud carrying and slag discharge cannot be compared with that of long auger drilling machine for direct soil discharge
Second, a large amount of alkaline waste mud must be transported outside for treatment, causing pollution and increasing costs
Third, the rebar must first be inserted into the mud
This kind of mud-glued steel bar has poor grip between concrete and concrete.
Fourth, the joints are often muddy and leaking
Fifth, the sealer is difficult to pull out and often cannot be recycled
The piles made by the mud retaining method have silt sediment at the bottom of the pile, and a layer of mud skin between the pile and the soil around the pile, so the end bearing capacity of the pile and the frictional resistance of the pile side are greatly weakened, which seriously reduces the bearing capacity of the pile. carrying capacity

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method and equipment for continuous underground wall
  • Construction method and equipment for continuous underground wall
  • Construction method and equipment for continuous underground wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] From figure 1 It can be seen that a kind of underground diaphragm wall construction method, its specific steps are as follows:

[0015] 1. Drill holes with a special combined long auger drilling machine. (For ease of drawing, the SPR-1 three-axis drilling rig is shown in the figure, and the SPR-2 five-axis drilling rig and SPR-3 seven-axis drilling rig can also be used.) The common feature of this type of drilling rig is the blade of the adjacent drill rod The direction of rotation is opposite, and they mesh with each other. When working, the direction of rotation is opposite but the speed of rotation is the same. It can be drilled smoothly in various cohesive soil layers, and the phenomenon of "sticky drilling" does not occur.

[0016] 2. After drilling to the predetermined depth, press the grout from the nozzle at the drill bit to the bottom of the hole through the inner core tube of the drill pipe while lifting the drill until it is above the position where the hol...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Durng the construction of continuous underground wall, after the hole is drilled by special drilling machine to set depth, grout is first pressed via the core tube of drilling rod to the hole, sealing device and the reinforced bar cage are then set in the hole, and concrete is finally deposited with the displaced grout is recovered. The construction method of the present invention has high speed. When the method is used in constructing pile, the constructed pile has high strength, large friction force with round soil layer because of the high pressure penetrated grout, no deposited sludge in the pile bottom, and thus high bearing capacity.

Description

technical field [0001] The invention relates to a building construction method and device, in particular to a construction method and device for an underground continuous wall poured with concrete. Background technique [0002] We know that the traditional underground diaphragm wall construction often uses mud circulation to protect the wall and drill holes. The mud has two main functions: one is the retaining wall, which supports the hole wall with liquid mud and forms a mud skin to stabilize the hole wall and prevent collapse; It is slag carrying, using the circulating mud as a carrier to carry and discharge the sand, gravel and mud slag drilled at the bottom of the hole. There is following shortcoming in this method: the first, construction speed is very slow. The mud used as the carrier is usually 3-5 times the volume of the drilled hole. During the circulation process, the viscosity, density, colloid rate, sand content and other indicators of the mud must be constantly...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/20
Inventor 石午江石寅生
Owner 石午江
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More