Unlock instant, AI-driven research and patent intelligence for your innovation.

Temporary support structure for steel beam across existing line and method for constructing steel beam

A temporary support and steel beam technology, applied in the direction of bridges, bridge materials, bridge construction, etc., can solve the problems of cumbersome tensioning process, many temporary beams, large beam height value, etc., to achieve convenient and rapid erection and disassembly, and construction speed Fast, overall high performance results

Pending Publication Date: 2019-09-17
CHINA RAILWAY SCI & IND GRP RAIL TRANSPORTATION EQUIP LIMITED
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the jacking construction method has the following obvious defects: there are many restrictions on the geometric shape of the bridge structure. The continuous change of force will increase the beam height and material consumption, especially the amount of prestressed steel bars. Due to the limitation of the bending moment of the jacking cantilever, it is uneconomical for the jacking span to be greater than 70-80 meters; repeated stress during the jacking process , so that the value of the beam height is large, there are many temporary beams, and the tensioning process is cumbersome; in addition, the jacking construction can only have two working faces at most, which also limits the speed of the jacking construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary support structure for steel beam across existing line and method for constructing steel beam
  • Temporary support structure for steel beam across existing line and method for constructing steel beam
  • Temporary support structure for steel beam across existing line and method for constructing steel beam

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0058] Embodiment: As shown in Figure 7, for the installation and erection of the elevated bridge of the ring line intercommunication hub, the steel girder sections required to be installed are all located on a circular curve with a relatively large radius and arc shape, and the top and bottom of the steel box girder have two-way transverse slopes. The facade has a large longitudinal slope and is on a convex vertical curve with a large radius. The steel frame bridge spans over the existing line; if Figure 8 As shown, there are pier columns for supporting steel beams on both sides of the existing line, and a bracket system for auxiliary support is erected by traditional methods; the steel beams between the two sets of pier columns are divided into six axially symmetrical steel beams The beam sections are respectively represented by A, B, C, D, E, and F. The middle steel beam section A and the steel beam section B are located above the existing line and are supported by the tem...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a temporary support structure for a steel beam across an existing line. The temporary support structure for the steel beam across the existing line comprises two sets of supporting systems and a supporting bracket; the two sets of supporting systems are symmetrically arranged on both sides of the existing line, and the lower ends of the support systems are arranged on the ground. The supporting bracket transversely spans the existing line and is mounted on the two supporting systems; the steel beam to be installed is mounted on the supporting bracket. The invention further provides a method for constructing a steel beam section across the existing line. The temporary support structure for the steel beam across the existing line and the method for constructing the steel beam section across the existing line have the beneficial effects that the hoisting of the steel beam across the existing line can be completed without hindering the normal passage of the existing line, and the method of direct use of the crane hoisting in a blocked mode makes up for the deficiency and limitation in the use of an incremental launching method; and the temporary support structure for the steel beam across the existing line and the method for constructing the steel beam section across the existing line are further applicable to the case where the steel beam is overweight and cannot be hoisted as a whole, but can only be hoisted in pieces, and the steel beam to be constructed is located circular curves with relatively large radius and radian line type.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a steel beam temporary support structure spanning an existing line and a steel beam construction method. Background technique [0002] With the rapid development of my country's infrastructure construction and transportation industry, more and more road and railway bridges are being built across seas, rivers and land, and the complex environment and working conditions of various bridge constructions have become a big challenge challenge. Different bridges have different construction methods due to their different construction environments, involving different temporary supports and installation techniques. In addition, considering factors such as project progress and construction speed, safety and economy, how to optimize the temporary support and its construction method under the condition of meeting the technical and economic requirements is the key during the const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D101/30
CPCE01D21/00E01D2101/30
Inventor 徐永李桐周超傅存海童清徐德森王作轩刘静静祁经炜周俊韬王彦辉
Owner CHINA RAILWAY SCI & IND GRP RAIL TRANSPORTATION EQUIP LIMITED