Building garbage management system based on big data analysis and method thereof
A management system and building technology, applied in the field of building waste management system, can solve the problems of ground damage, difficult to clean up, ground contamination, etc., and achieve the effect of improving recycling efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Such as Figure 1-3As shown, a building waste management system based on big data analysis includes a recovery mechanism, a detection mechanism, and a control mechanism. The control mechanism includes a processing module 1, a driving module 2, a positioning module 3, a navigation module 4, and a storage module 5 And information sending module 6, described processing module 1 is connected with described driving module 2, described positioning module 3, described navigation module 4, described storage module 5 and described information sending module 6 respectively, described positioning module 3 for obtaining the location information of the recovery mechanism and sending the location information to the processing module 1, and the navigation module 4 for generating the moving route of the recycling mechanism and sending the moving route to the processing module 1 Module 1, the information sending module 6 is used to send warning information to residents in the building, ...
Embodiment 2
[0057] Such as Figure 1-3 As shown, a working method of a building waste management system based on big data analysis includes the following working steps:
[0058] S101: The processing module 1 imports the topographic map of the building group into the navigation module 4, and the navigation module 4 generates a patrol route of the mobile device 9 along the building group and sends the patrol route to the processing module 1 ;
[0059] S102: The processing module 1 outputs a patrol signal to the driving module 2, and the driving module 2 drives the mobile device 9 to move according to the patrol route;
[0060] S103: The first camera device 8 acquires the environment around the vehicle body 7 and sends the first captured image to the processing module 1;
[0061] S104: The processing module 1 determines whether there is garbage on the ground surface according to the first captured image;
[0062] S105: If yes, the processing module 1 further judges whether the garbage is ...
Embodiment 3
[0081] Such as Figure 1-3 As shown, the temperature sensor 17 detects the surface temperature and sends the temperature value to the processing module 1;
[0082] The processing module 1 judges whether the temperature value is greater than or equal to a preset temperature value;
[0083] If so, the processing module 1 outputs a sprinkler signal to the driving module 2, and the driving module 2 drives the sprinkler device 18 to start.
[0084] Before the processing module 1 outputs the water sprinkling signal to the driving module 2, it also includes:
[0085] The processing module 1 outputs a dust suction signal to the driving module 2, and the driving module 2 drives the dust suction device 19 to start.
[0086] Specifically, when the temperature is too high in summer, continuous exposure to the sun will cause damage to the road surface. In this embodiment, when the mobile device 9 moves along the patrol route, the temperature sensor 17 will detect the surface temperature ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com