[0059] This example takes the No. 124 water plant relocation and water supply guarantee project in the central city of Yibin as an example to illustrate the underwater trench excavation project of the water intake head of the Pu'an Water Plant and the underwater placement of the water diversion pipe, which belongs to the Jinsha River Basin It is carried out in the navigation area in the center of the river, the first-class water source, and the Chinese sturgeon protection area. The characteristic is that the river is turbulent and there are many eddies. The embodiment of the present invention realizes the trench excavation construction in the undulating riverbed of the deep-water river, accelerates the realization of the construction period target during the construction process, and also reduces the safety risk of water and underwater operations in the deep-water rapids riverbed in mountainous areas. It is well received by the owner, design and supervision units.
[0060] The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com