Pump room construction method and pump room construction dewatering system in tunnel communication channel
A communication channel and construction method technology, which is applied in the field of pump room construction dewatering system, can solve the problems of inconvenient excavation and construction of the pump room, and achieve the effects of small depth, low construction cost, and convenient excavation and construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0054] Such as Figure 1 to Figure 8 As shown, under the ground 11, there is a grouting reinforcement area 1 reinforced by grouting method. In the grouting reinforcement area 1, there is a communication channel excavation area 2, and the ground of the communication channel excavation area 2 is the communication channel ground 3 , the pump room construction dewatering method in the tunnel communication channel, comprising the following steps:
[0055] First, determine a pump room area to be excavated on the ground 3 of the communication channel, and then make a dewatering well 4 in the area to be excavated in the pump room, such as figure 2 As shown, the dewatering well hole 41 is located in the middle of the excavation area of the pump house, and the bottom of the dewatering well 4 is lower than the elevation of the bottom plate 9 of the pump house, so that the seepage water in the area to be excavated in the pump house will eventually flow into the well of the dewatering w...
Embodiment approach 2
[0061] In this embodiment, the foundation pit of the pump room is excavated before the water level in the dewatering well drops below the level of the bottom plate of the pump room by pumping water.
specific Embodiment approach 3
[0063] In this embodiment, the elevation of the upper end of the filter cartridge 5 is lower than the elevation of the ground of the communication passage. The groundwater level is 0.3m-0.5m.
[0064] Specific implementation method 1 of the pump room construction dewatering system in the tunnel communication channel:
[0065] Such as Figure 1 to Figure 4 As shown, under the ground 11, there is a grouting reinforcement area 1 reinforced by grouting method. In the grouting reinforcement area 1, there is a communication channel excavation area 2, and the ground of the communication channel excavation area 2 is the communication channel ground 3 , on the area to be excavated of the pump room on the ground 3 of the communication channel, the pump room construction dewatering system in the tunnel communication channel of the present invention includes a dewatering well 4, and its dewatering well hole 41 is located in the middle of the excavation area of the pump room , the dewa...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com