Automatic unwinding device for train cables
A pay-off device and cable technology are applied in the field of train cable automatic pay-off devices, which can solve the problems of inability to meet high-efficiency production cycle requirements, time-consuming and labor-intensive measurement and positioning methods, and poor measurement accuracy, thereby saving labor costs and actions. Accurate and fast, the effect of reducing labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention will be further described in detail below in conjunction with the drawings.
[0029] Such as Figure 1 to Figure 10 As shown, the train cable automatic pay-off device of the present invention includes an electrical control box and a handheld button controller electrically connected to it, a measuring platform 1, a guide rail 2, a wire pulling mechanism 3, a slider mechanism 4, and two visual inspection devices 5, Pay-off guide shaft 6, two fixed pulleys 7, two traction wire ropes 8, two sets of drive mechanisms 9, two travel switches 10, and a cable storage tray 11; the cable tray 11 is arranged outside the rear end of the measurement platform 1, The bottom of the pay-off guide shaft 6 is fixedly connected to the end of the measuring platform 1; two fixed pulleys 7 are fixedly connected to the outer side walls of the two short sides of the measuring platform 1 symmetrically, and the guide rail 2 is fixedly connected along one long side of the measurin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


