Storable rubber powder modified asphalt and preparation method thereof
A modified asphalt, storage-resistant technology, applied in building components, building insulation materials, construction and other directions, can solve the problems of rubber asphalt failing to meet design requirements, rubber asphalt cannot be stored overnight, and mixture design failures, etc., and achieve low prices. , Reduce product cost, good performance attenuation and low temperature crack resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Take 7.8t of Liaohe No. 90 asphalt and heat it to 180°C in a reactor, then add 2.2t of waste tire rubber powder with a water content of less than 5%, a metal content of less than 0.4%, an ash content of less than 8%, and a mesh size of 30 mesh. Containing 0.25% dicumyl peroxide in the mass fraction of the rubber powder, adding 0.3% alkylphenol polysulfide in the rubber powder mass, stirring at a low speed (300-1000 rpm) for 15 minutes in a mixing tank, Raise the temperature to 190°C, then grind it again with a high-speed shearing machine, pump it to a storage tank for development, and add an anti-reversion agent of 0.15% of the rubber powder mass to the developed product, wherein the anti-reversion agent is bismaleimide and stir evenly to obtain storable rubber powder modified asphalt.
Embodiment 2
[0026] Take 8.5t of Liaohe No. 90 asphalt and heat it to 180°C in a reaction kettle, then add 1.5t of waste tire rubber powder with a water content of less than 5%, a metal content of less than 0.4%, an ash content of less than 8%, and a mesh size of 30 mesh. Containing 0.25% dicumyl peroxide in the mass fraction of the rubber powder, adding 0.3% alkylphenol polysulfide in the rubber powder mass, stirring at a low speed (300-1000 rpm) for 15 minutes in a mixing tank, Raise the temperature to 190°C, then grind it again with a high-speed shearing machine, pump it to a storage tank for development, add an anti-reversion agent of 0.15% of the rubber powder mass to the developed product, wherein the anti-reversion agent is a silane tetrasulfide compound, and stir Evenly, the storable rubber powder modified asphalt is obtained.
Embodiment 3
[0028] Take 7.9 tons of Liaohe No. 90 asphalt and heat it to 180°C in a reaction kettle, then add 2.1 tons of waste tire rubber powder with a water content of less than 5%, a metal content of less than 0.4%, an ash content of less than 8%, and a mesh size of 30 mesh. Containing 0.25% dicumyl peroxide in the mass fraction of the rubber powder, adding 0.3% alkylphenol polysulfide in the rubber powder mass, stirring at a low speed (300-1000 rpm) for 15 minutes in a mixing tank, Raise the temperature to 190°C, then grind it again with a high-speed shearing machine, pump it to a storage tank for development, add an anti-reversion agent of 0.15% of the rubber powder mass to the developed product, wherein the anti-reversion agent is a silane tetrasulfide compound, and stir Evenly, the storable rubber powder modified asphalt is obtained.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com