Earth shoulder synchronous hilling construction method for preventing pavement structure layer from being polluted
A pavement structure and pollution prevention technology, applied in the direction of roads, roads, road repairs, etc., to achieve the effect of solving compaction difficulties, reducing waste of ultra-wide paving, and ensuring zero pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] In this embodiment, a soil road shoulder synchronous construction method for preventing pollution of the pavement structure layer is illustrated by taking four layers of construction layers as an example; in practical applications, it can also be divided into other numbers of construction layers for construction, such as five layers, six layers, Seven floors, maybe even more.
[0031] like figure 1 and figure 2 As shown, a soil road shoulder synchronous soil construction method for preventing pollution of the pavement structure layer: the road surface and the soil road shoulder are divided into several construction layers according to the height, and the construction is carried out layer by layer from bottom to top;
[0032] In this embodiment, it is divided into four layers of construction layers; wherein, the road surface is divided into subbase, lower base, upper base and asphalt surface layer from bottom to top; the soil road shoulder is divided into the first lay...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

