A technology with wide caps and high blocks, which is applied in the field of port and wharf engineering, can solve the problems of poor foundation soil bearing capacity, difficult wharf, uneconomical and other problems, and achieve the effect of durable structure, good economy and reduced consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A wharf structure with pile foundations, wide caps and high retaining walls described in this embodiment is suitable for areas with large water level differences in inland rivers, where there is a quicksand layer with a thickness ranging from 5 to 17 m in the shallow part of the designed mud surface, and a weakly weathered rock foundation in the deep part. Its structure is as figure 1 , figure 2 and image 3 As shown, it includes foundation pile 1, wide cap 2 and high retaining wall 3. The top of the foundation pile 1 is integrally fixed to the bottom plate of the wide cap 2 , the high retaining wall 3 is integrally fixed to the wide cap 2 , and the foundation pile 1 , the wide cap 2 and the high retaining wall 3 form an overall space structure.
[0032] In the embodiment, foundation pile 1 adopts rock-socketed cast-in-place pile with steel protection pipe with a pile diameter of 800mm, and passes through the upper quicksand layer to the lower weakly weathered rock. ...
Embodiment 2
[0040] The pile foundation wide cap and high retaining wall wharf structure under the same geological conditions of the present embodiment and embodiment 1, such as Figure 5 As shown, different from Example 1, a steel rail 21 is provided on the top of the retaining wall 17, and the back of the high retaining wall 3 is still arranged in a broken line. Change the folding line of the wall back in the range of body width B2 to be arranged vertically. In this embodiment, the width of the retaining wall at the folding point of the wall back is 2.50m, the bottom width B3 of the retaining wall below the folding point of the wall back is 7.50m (including the bottom width of the plinth), and the top width B2 of the retaining wall above the folding point of the wall is 2.50m m.
PUM
| Property | Measurement | Unit |
|---|---|---|
| Particle size | aaaaa | aaaaa |
| Pile diameter | aaaaa | aaaaa |
| Wall thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 