PE feed pipe
A technology for water supply pipes and water pipes, applied in the field of PE water pipes, can solve the problems of easy to burst water pipes, leakage of pipes and connecting heads, easy freezing of water pipes, etc., and achieve the effect of improving performance, firm connection of pipes, and good compression resistance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Embodiment one, as Figure 1-Figure 6 As shown, a PE water supply pipe according to the present invention includes a PE water supply pipe main body 1 and a water pipe connector 2, a corrugated pipe 1a is installed on the water pipe main body 1, and the water pipe connector 2 is arranged on the PE water supply pipe main body 1, the main body 1 of the PE water supply pipe is composed of a PE pipe inner layer 11, a nano-antibacterial layer 12, a filter layer 13, a PE pipe outer layer 14 and a thermal insulation layer 15, and the PE pipe inner layer 11, the nano-antibacterial layer 12, The filter layer 13, the PE pipe outer layer 14 and the insulation layer 15 are arranged sequentially from the inside to the outside, the outer wall of the PE pipe inner layer 11 is provided with a nano-antibacterial layer 12, and the outer wall of the nano-antibacterial layer 12 is provided with a filter layer 13 , the outer wall of the filter layer 13 is provided with a PE pipe outer layer ...
specific Embodiment 2
[0036] Specific embodiment two, such as Figure 7 As shown, on the basis of Embodiment 1, the two-way connection sleeve 21 is replaced by a right-angle connection sleeve 26. When the water pipes are connected, the ends of the pipes are cut flat with an electric rotary knife to ensure that the contact surfaces of the two pipes can be fully connected. The two PE pipes that need to be installed and connected are placed on the fixture of the fuser at the same time (the fixture can be replaced according to the diameter of the pipe to be installed), and the other end of each pipe is held up to the same level by the pipe bracket. After the connection end of the main body 1 of the water supply pipe is melted, it is quickly inserted into the insertion groove 22 at one end of the right-angle connection sleeve 26. The diameter of the outer wall of the main body 1 of the PE water supply pipe is slightly larger than the inner diameter of the insertion groove 22, so that the melted PE water ...
specific Embodiment 3
[0037] Specific embodiment three, such as Figure 8 As shown, on the basis of Embodiment 1, the right-angled connecting sleeve 26 is replaced with a three-way connecting sleeve 27. When connecting the water pipes, the ends of the pipes are cut flat with an electric rotary knife to ensure that the contact surfaces of the two pipes can be fully connected. The two PE pipes that need to be installed and connected are placed on the fixture of the fuser at the same time (the fixture can be replaced according to the diameter of the pipe to be installed), and the other end of each pipe is held up to the same level by the pipe bracket. After the connection end of the main body 1 of the water supply pipe is melted, it is quickly inserted into the inside of the insertion groove 22 at one end of the tee connection sleeve 27. The diameter of the outer wall of the main body 1 of the PE water supply pipe is slightly larger than the inner diameter of the insertion groove 22, so that the melted...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


