A technology of process control and material reduction line, applied in the field of blast furnace smelting, can solve the problems of inability to feed material, burn out furnace top equipment, and high furnace top temperature, and achieve the effects of preventing gas explosion, improving safety, and improving the environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment example 1
[0040] A certain 1800m 3 After 8 years of blast furnace production, the empty material line was shut down for maintenance. In order to ensure the gas safety during the shutdown process and reduce the H2 content in the gas, the shutdown method is as follows.
[0041] 1. Do a good job of preparation before the empty material line
[0042] 1) Appropriately reduce the amount of coke in the center by 50% 8 hours in advance.
[0043] 2) Install a set of furnace top atomization water pumping device to ensure sufficient water pumping capacity of 120t / h.
[0044]3) The static pressure pipe hole of the furnace body is ready to pass through N 2 , up to 10000m 3 / h.
[0045] 4) Prepare 2 probes that can reach the tuyere, the depth can reach 25m, and mark it on the chain.
[0046] 5) Before stopping the furnace, keep the furnace running smoothly and the furnace temperature is sufficient, and add 600kg / batch of manganese ore to wash the furnace one day in advance.
[0047] 6) Furnace...
Embodiment example 2
[0063] A certain 3200m 3 After 13 years of blast furnace production, the empty material line was shut down for maintenance. In order to ensure the gas safety during the shutdown process, reduce the H in the gas 2 content, the shutdown method is as follows.
[0064] 1. Do a good job of preparation before the empty material line
[0065] 1) Appropriately reduce the amount of coke in the center by 30% 8 hours in advance.
[0066] 2) Install a set of furnace top atomization water pumping device to ensure sufficient water pumping capacity of 200t / h.
[0067] 3) The static pressure pipe hole of the furnace body is ready to pass through N 2 , up to 15000m 3 / h.
[0068] 4) Prepare 2 probes that can reach the tuyere, the depth can reach 28m, and mark it on the chain.
[0069] 5) Before stopping the furnace, keep the furnace running smoothly and the furnace temperature is sufficient, and add manganese ore to wash the furnace 1000kg / batch one day in advance.
[0070] 6) The load...