Lime kiln calcining process for active calcium oxide production
A technology of activated calcium oxide and calcination process, applied in the field of lime kiln calcination process, can solve the problem of uneven heating of limestone, achieve the effect of reducing the formation of underfired lime and overfired lime, and uniform heating
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] The invention discloses a lime kiln calcination process for the production of active calcium oxide. The calcination process is carried out in a special lime kiln; figure 1 and figure 2 As shown, the special lime kiln includes a vertical holding furnace body 11, and the holding furnace body 11 includes a preheating zone 11, a calcination zone 12 and a cooling zone 13 from top to bottom, and the preheating zone 11, the calcination zone 12 and the cooling zone 13 is provided with a temperature detector 14 at the bottom and top; the lime kiln also includes a feed inlet 2 arranged at the top of the holding furnace body 11, a distributor 15 arranged at the feed inlet 2, and a material distributor 15 arranged at the bottom of the holding furnace body 11. The discharge port 3 at the end, the gas pipe 4 arranged at the bottom of the calcination zone 12 of the holding furnace body 11, the cooling gas pipe 5 arranged at the bottom of the cooling zone 13 and the smoke exhaust pipe...
Embodiment 2
[0055] A lime kiln calcination process for active calcium oxide production, comprising the following steps:
[0056] Stone pretreatment:
[0057] Crumble the limestone raw material into 20mm limestone particles, and then use the bucket elevator to transport the limestone particles to the distributor 15 at the top of the special lime kiln, and the distributor 15 will then add the limestone particles to the preheating zone 11 at the top of the holding furnace In; Calcination process also includes the following steps:
[0058] Preheating in preheating zone 11: the limestone particles are preheated by the rising high-temperature gas in the calcining zone 12, and the preheating temperature is 960°C; The time for transporting the material (including the time for the material to move from the distributor 15 to the distribution plate 7, but excluding the time for the preheated material to fall into the calcining zone 12, the material falling time is controlled by the flow rate of the...
Embodiment 3
[0063] A lime kiln calcination process for active calcium oxide production, comprising the following steps:
[0064] Stone pretreatment:
[0065] The limestone raw material is crushed into 25mm limestone particles, and then the limestone particles are transported to the distributor 15 at the top of the special lime kiln by the bucket elevator, and the distributor 15 then adds the limestone particles to the preheating zone 11 at the top of the holding furnace body 1 In; Calcination process also includes the following steps:
[0066] Preheating in preheating zone 11: the limestone particles are preheated by the high-temperature gas rising in the calcining zone 12, and the preheating temperature is 990°C; the residence time of limestone particles on the six-layer distribution board 7 is 6.5 minutes, and the 7 distribution boards The time for transporting the material (including the time for the material to move from the distributor 15 to the distribution plate 7, but excluding the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


