Induced grouting method
A technology of grouting and grouting holes, which is applied in the fields of soil protection, construction, and infrastructure engineering, etc., and can solve the problems that the grouting effect cannot meet expectations, and the grout in closed formations cannot be fully poured in.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] For a large river-crossing bridge, the main pier adopts the main pier foundation form of a circular underground diaphragm wall (referred to as the ground connection wall) + pebble stratum grouting foundation. The main pier is located in the alluvial river terrace landform, the terrain is relatively flat and open, the ground elevation is 27.70-38.70m, the thickness of the soft plastic silty clay stratum is 2-15.1m (the elevation is 21.48-24.77m), the plastic silty clay stratum The layer thickness is 7.3~13.1m (the elevation is 11.48~14.79m), the pebble stratum is 13.7~19.8m thick (the elevation is -0.31~-3.02m), the thickness of the moderately weathered marl layer is 24.6~30.3m (the elevation is -27.62~ 32.52m), the elevation of the foundation pit bottom of the ground connection wall is -10.5~-5m.
[0043] The outer diameter of the ground connection wall is 60.0 meters, the thickness of the wall is 1.2 meters, and the height of the wall is 29.0m to 35m. After the constr...
Embodiment 2
[0056] Such as figure 1 with 4 As shown, a kind of inductive grouting method described in the present invention is different from Embodiment 1 in that the regular figure in this embodiment is a rhombus, that is, the four adjacent grouting holes 5 form a rhombus Distribution, the numbers of the four grouting holes 5 in each rhombus include at least one ①, at least one ② and at least one ③, and the grouting holes 5 of all numbers ① in the pouring area are still poured first, Refill all the grouting holes 5 numbered ②, and finally pour all the grouting holes 5 numbered ③.
Embodiment 3
[0058] Such as figure 1 , 5 As shown in and 6, a kind of inductive grouting method described in the present invention differs from Embodiment 1 in that in this embodiment, the dividing line of the grouting plane is a circle, and the outer area is Figure 5 Middle A area, the central area is Figure 5 In the middle G area, the outer area is poured first, and then the central area is poured; when pouring, all the grouting holes 5 with the number ① in the poured area are poured first, and then all the grouting holes 5 with the number ② are poured, and finally poured The grouting holes 5 of all numbers ③.