technical field
[0001] The present application relates to the technical field of shutting down an empty material line for blast furnace ironmaking, and in particular, relates to a method for cleaning a blast furnace before shutting down. Background technique
[0002] At present, the large and medium maintenance of the blast furnace generally adopts the method of stopping the furnace with an empty material line. First, it can create convenient conditions for the large and medium maintenance and realize a safe and smooth shutdown; downtime.
[0003] In the prior art, the furnace wall is not clean after shutdown using the empty material line shutdown method, and there are still many places on the furnace wall with adhesives, and there are accumulations in the hearth. It takes a long time to process the material and hearth accumulation, which prolongs the shutdown time of the blast furnace. Contents of the invention
[0004] The purpose of this application is to provide a me...