Unlock instant, AI-driven research and patent intelligence for your innovation.

A Flexible Multitask Scheduling Method in Manufacturing System

A technology of manufacturing system and scheduling method, applied in the direction of general control system, control/regulation system, program control, etc., can solve conflicts between energy consumption and workload balance without consideration, conflicts of interests between manufacturing enterprises and manufacturing systems, Unable to balance the workload of manufacturing enterprises and other issues, to achieve the effect of maintaining group diversity, reducing idle energy consumption, and improving convergence speed

Active Publication Date: 2021-10-08
ZHEJIANG UNIV OF FINANCE & ECONOMICS
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] It can be seen that most of the current research on reducing energy consumption in the manufacturing process focuses on the single goal of minimizing total energy consumption, without considering the conflict of interest between the manufacturing enterprise and the manufacturing system, that is, the conflict between energy consumption and workload balancing , such a manufacturing enterprise that is prone to monopoly cannot balance the workload of different manufacturing enterprises, which is not conducive to the healthy development of the manufacturing system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Flexible Multitask Scheduling Method in Manufacturing System
  • A Flexible Multitask Scheduling Method in Manufacturing System
  • A Flexible Multitask Scheduling Method in Manufacturing System

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, not to limit the present application.

[0044] The present application is a flexible multi-task scheduling method in a manufacturing system, which aims to find a feasible scheduling solution that can balance total energy consumption and workload, and assign manufacturing tasks to manufacturing services for execution.

[0045] Such as figure 1 As shown, the technical solution of the present application is based on the following application scenarios: one manufacturing task (also referred to as task) {T 1 ,...,T I} submitted to the manufacturing system, each by J i A task T composed of subtasks in sequence iby another manufact...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a flexible multi-task scheduling method in a manufacturing system. The time limit and quality limit of tasks are used as constraints, and the goal of minimizing total energy consumption and work load balance is established to establish a dual-objective optimization model. In stages, the service allocation vector is first iterated, and then the subtask sequence vector is generated and iteratively processed. Finally, the service allocation vector and the subtask sequence vector are processed, and the service allocation is considered in the search space that has been reduced by the first two stages. and subtask order to trade off total energy consumption and workload balancing under the constraints of quality and completion time. The invention has better performance when solving the multi-task scheduling problem considering energy consumption and intermediate buffer.

Description

technical field [0001] The application belongs to the technical field of flexible multi-task scheduling in manufacturing systems, and in particular relates to a flexible multi-task scheduling method in manufacturing systems. Background technique [0002] The flexible multi-task scheduling problem in manufacturing systems has been extensively studied in recent years. Traditional multi-task scheduling problems often optimize the quality of service (QoS) from the perspective of customers, such as time, cost, and reputation. However, when the optimization target is limited to the interests of customers, different tasks may be assigned to the same manufacturing service, resulting in idle resources and reducing resource utilization efficiency. [0003] The data show that manufacturing is the main sector of global energy consumption, and reducing energy consumption is a necessary condition for the manufacturing system to achieve green manufacturing. People have realized the importa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G05B19/418
CPCG05B19/41885G05B2219/32339Y02P90/02
Inventor 张帅丁捷频张文宇冯睿隽徐纪元
Owner ZHEJIANG UNIV OF FINANCE & ECONOMICS