A construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space

An underground space and construction method technology, applied in underground chambers, earthwork drilling, mining equipment, etc., can solve the problems of high construction risk, high excavation difficulty, and high manufacturing difficulty, so as to improve economic benefits and reduce construction difficulty. and risk, reducing the effect of construction difficulty

Active Publication Date: 2022-02-15
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF19 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the current technical problems of rectangular or quasi-rectangular ultra-large section equipment manufacturing difficulty, high excavation difficulty, long construction period, and high construction risk, the present invention proposes a construction method for large section underground space

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space
  • A construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space
  • A construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] Embodiment 1: A kind of construction method of large section underground space, comprises the following steps:

[0040] S1. Construction preparation: if figure 1As shown, according to the area of ​​underground space to be built, symmetrical originating shaft 1 and receiving shaft 2 are built at appropriate positions on the construction site. Requirements for pipe section 4.

[0041] S2. Jacking area planning: such as figure 2 As shown, the underground construction space area is first divided into the central excavation area 6, and the periphery of the central excavation area 6 is divided into U-shaped subdivision excavation areas, and the central excavation area 6 is divided into one-to-one correspondence with the subdivision excavation areas, and then Divide the partial excavation area into several jacking units 5. The jacking units are divided according to engineering conditions and reasonably determined modulus. The section size of each jacking unit matches the ex...

Embodiment 2

[0048] Embodiment 2: a kind of construction method of large-section underground space, such as Figure 9 with Figure 10 As shown, in the step S2, the underground construction space area is firstly divided into two groups of jacking units 5, the overall shape of the two groups of jacking sections is a mountain shape, and a group of central excavation areas are respectively divided into the inner sides of the two groups of jacking sections. In the embodiment, the section of the jacking unit is preferably 5m wide and 5m high; as Figure 11 As shown, the jacking device is used to symmetrically jack up synchronously or step by step along both sides of the planned jacking section, assemble the combined pipe joint 4, complete the reception of the rectangular roadheader in the receiving shaft 2, and complete the construction of a jacking unit. Excavation and support construction, and complete the excavation and support construction of the remaining jacking units in sequence; then re...

Embodiment 3

[0050] Embodiment 3: A construction system for a rectangular or quasi-rectangular super-large-section underground space, including a central excavation area and subdivision excavation areas, the subdivision excavation areas are located on the periphery of the central excavation area, and subdivision excavation areas are provided with Several jacking units, the jacking unit is assembled with a combined pipe joint, and the adjacent combined pipe joints are connected and assembled in sequence in the partial excavation area to form a pipe joint support structure as a whole, and a waterproof structural unit is laid in the jacking unit , the adjacent waterproof structural units are successively laid in the subdivision excavation area to form a waterproof structure as a whole, the outer peripheral main structural unit is laid in the jacking unit, and the adjacent outer peripheral main structural units are laid in turn in the subdivision area to form a subdivision area as a whole The o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention proposes a construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space, including the following steps: S1, construction of the originating shaft and the receiving shaft; S2, dividing the underground construction space into partial excavation areas and central excavation Excavation area; S3, carry out jacking construction on the divided jacking units, and construct support; S4, construct the outer peripheral main structure of the jacking tunnel after the jacking construction is completed; S5, then carry out excavation construction in the central area; S6 , Finally, carry out the construction of the internal main structure and the sealing treatment of the outer main structure. The present invention forms a super-large-section underground space after being excavated by a plurality of excavation units as a whole, which can effectively reduce the construction area, reduce the impact on the surrounding environment, and realize the green and efficient development of the underground space.

Description

technical field [0001] The invention relates to the technical field of underground engineering, in particular to a construction method and construction system for a rectangular or quasi-rectangular super-large-section underground space. Background technique [0002] In order to alleviate the problem of urban land use, the downward development of cities has become an inevitable trend. In order to ensure the utilization rate of space, the urban underground space mostly has rectangular and quasi-rectangular cross-sections, which are usually constructed by open cut, cover excavation, mine method and mechanical excavation method. The traditional open cut method and cover excavation method have a great impact on the ground environment and are no longer suitable for urban bustling areas; the mining method has high construction safety risks, low degree of mechanization, and large construction impact; the commonly used mechanical excavation method is restricted by existing technologi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D13/02
CPCE21D13/00
Inventor 李洋李鹏于少辉程鹏白中坤付增
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD