Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of open-arch concealed half-wall and half-arch protection structure of shallow-buried bias tunnel penetrating through accumulation body

A construction method and technology of accumulation body, applied in the direction of tunnel, tunnel lining, infrastructure engineering, etc., can solve the problems of large construction workload of auxiliary engineering, unfavorable project control, high engineering cost, and achieve simple structure and low construction cost. , the effect of good mechanical performance

Active Publication Date: 2020-12-25
SINOHYDRO BUREAU 14 CO LTD
View PDF24 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The construction of the tunnel entrance through the accumulation body has always been a technical difficulty and the focus of safety control in tunnel construction. The use of traditional direct open-cutting into the hole will inevitably cause disturbance of the accumulation body and cause landslides and mountain deformation. The accumulation body needs to be cleaned in advance. Pile pre-reinforcement grouting, auxiliary engineering construction workload is large, the project cost is high and the time period is long, the safety risk is high during construction, which is not conducive to the control of the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of open-arch concealed half-wall and half-arch protection structure of shallow-buried bias tunnel penetrating through accumulation body
  • Construction method of open-arch concealed half-wall and half-arch protection structure of shallow-buried bias tunnel penetrating through accumulation body
  • Construction method of open-arch concealed half-wall and half-arch protection structure of shallow-buried bias tunnel penetrating through accumulation body

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0044] It should be noted that, the methods described in the following embodiments, if no special instructions, are conventional methods, and the materials and equipment, if no special instructions, can be obtained from commercial sources; numbering and positional relationship in the terms are Based on the orientation or positional relationship shown in the drawings, it is only for the convenience of describing the patent of the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot It is understood as a limitation on the patent of the present invention.

[0045] Such as Figure 1-6 As shown, the construc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of an open-arch concealed half-wall and half-arch protection structure of a shallow-buried bias tunnel penetrating through an accumulation body. The construction method comprises a half-wall and half-arch protection structure body and an open-arch concealed reverse underground excavation tunnel-entering construction method. The open-arch concealed reverse underground excavation tunnel-entering construction method comprises the steps of backpressure backfill, advanced grouting supporting, a three-step seven-step reserved core geotechnical method anda monitoring and measuring method. According to the construction method, backfill soil is used for carrying out foot protection backpressure on the accumulation body, then a large pipe shed and a reinforcing mesh are constructed on the accumulation body, concrete is backfilled, and arch ring effect protection is formed; the supporting surfaces on the two sides of a semi-exposed and semi-concealedsleeve arch provide a protection body for underground excavation, and the accumulation body is less disturbed to maintain a relative stable state; and the tunnel portal protection structure is stablein type, simple in structure and good in stress performance, under the protection effect of the half-wall and half-arch sleeve arch, the safety, reliability and economical efficiency of tunnel construction are greatly improved through the construction method of reverse underground excavation out of a tunnel, large excavation is avoided, and the ecological environment is protected.

Description

technical field [0001] The invention belongs to the technical field of tunnel engineering construction such as highway engineering and railway engineering, and relates to the construction of tunnels passing through unfavorable geological sections, in particular to the entry construction of entrance engineering in unfavorable geological sections, and in particular to an open and concealed construction of shallow-buried bias-pressure tunnels passing through accumulative bodies The construction method of half-wall half-arch protective structure. Background technique [0002] The construction of the tunnel entrance through the accumulation body has always been a technical difficulty and the focus of safety control in tunnel construction. The use of traditional direct open-cutting into the hole will inevitably cause disturbance of the accumulation body and cause landslides and mountain deformation. The accumulation body needs to be cleaned in advance. Pile pre-reinforcement grout...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/04E21D11/18E21D11/15E21D20/00E21D11/10E21F16/02E02D17/20
CPCE21D9/04E21D11/18E21D11/152E21D20/00E21D11/10E21F16/02E02D17/207Y02A10/23
Inventor 林志斌徐建华缪买和肖小伟杨元林罗鸿儒颜天昊林杰周美全于家文
Owner SINOHYDRO BUREAU 14 CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products