Construction method of open-arch concealed half-wall and half-arch protection structure of shallow-buried bias tunnel penetrating through accumulation body
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- SINOHYDRO BUREAU 14 CO LTD
- Publication Date
- 2020-12-25
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of tunnel engineering construction such as highway engineering and railway engineering, and relates to the construction of tunnels passing through unfavorable geological sections, in particular to the entry construction of entrance engineering in unfavorable geological sections, and in particular to an open and concealed construction of shallow-buried bias-pressure tunnels passing through accumulative bodies The construction method of half-wall half-arch protective structure. Background technique
[0002] The construction of the tunnel entrance through the accumulation body has always been a technical difficulty and the focus of safety control in tunnel construction. The use of traditional direct open-cutting into the hole will inevitably cause disturbance of the accumulation body and cause landslides and mountain deformation. The accumulation body needs to be cleaned in advance. Pile pre-reinforcement grout...